| Installation | |
Installation |
|
|
Overview |
|
|
Installation steps | There are four main steps in the installation of the Sun Tie XR: | |
| 1. Mounting the unit | |
| 2. Making the DC connections from the PV array to the Sun Tie XR | |
| 3. Making the AC connections from the service utility panel to the | |
| Sun Tie XR | |
| 4. Grounding the PV array | |
| This section also discusses two installation options: connecting inverters | |
| in parallel and connecting the Remote Monitor. | |
|
|
|
| WARNING: FIRE, SHOCK and ENERGY HAZARDS | |
| Before installing the Sun Tie XR, read all instructions and | |
| cautionary markings located in this manual, on the PV array, | |
| and on the main service panel. | |
Mounting |
|
|
|
| |
Surfaces for | The Sun Tie XR must be mounted to a flat, vertical surface such as | |
mounting | wallboard or wood siding. Installation onto wallboard or concrete | |
| requires the use of anchors to properly hold the screws. | |
|
|
|
| WARNING: SHOCK HAZARD | |
| Before drilling holes to mount the Sun Tie XR, ensure there are | |
| no electrical wires or plumbing in this area. Since this unit is | |
| installed close to the utility entrance or meter, there may be a | |
| high concentration of electrical wire in the area. | |
|
|
|
|
| |
| CAUTION | |
| The Sun Tie XR weighs approximately 35 pounds. Always use | |
| proper lifting techniques during installation to prevent personal | |
| injury. | |
|
|
|