Installation

> 100 feet (30 m)

 

 

Main Utility

Utility

Solar

 

ST Unit

 

Breaker Panel

Meter

 

 

 

Ground

 

Array

 

 

 

 

 

 

AC Wiring

Bar

AC

 

DC Wiring

AC

 

Ground

 

Wiring to

 

(and ground)

 

Wiring

Utility

 

Bar

 

 

 

 

 

 

Ground

 

 

 

Bonded Neutral Wire

 

 

 

 

 

Frame to

 

 

 

 

 

Pole

Array Ground

Sun Tie Ground Wire

 

Utility Ground Wire

 

Wire

 

 

 

 

 

 

 

Buried Copper Wire

 

Buried Copper Wire

 

Array Ground Rod

 

Sun Tie Ground Rod

 

Utility Ground Rod

Figure 2-13 Long distance grounding

 

 

 

 

 

 

 

PV

 

 

 

 

 

 

 

ARRAYS

 

 

 

STXR UNIT

 

 

 

 

 

 

 

 

 

PV COMBINER BOARD

 

 

SOV

 

 

+

 

 

 

 

 

 

20 A

+

+

 

LIGHTNING

 

PV GROUND FAULT

 

A

 

 

 

ARRESTOR

 

BREAKERS (OPTION)

 

 

(OPTION)

 

100 A

 

20 A

+

+

15 A

 

 

100 A

 

 

+

+

 

 

L1

L1

 

20 A

+

+

15 A

 

 

 

 

 

 

 

 

 

L2

L2 INVERTER

 

 

20 A

+

+

 

 

 

 

 

 

 

 

 

 

 

G

 

 

G

 

20 A

+

+

 

1 A

 

GROUND

 

 

 

 

 

BAR

 

 

 

 

 

 

 

 

 

 

+

 

 

 

 

 

20 A

+

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Main

 

 

 

 

B

 

 

Breakers

 

 

 

 

Extra Ground Rod

 

 

 

 

 

 

 

 

 

 

 

 

 

Only Required on

G

 

 

L1

L2

 

 

Long Runs > 100

 

 

 

 

feet (30 m).

 

 

 

 

 

 

 

L2

 

 

 

 

 

 

 

 

Sun-Tie

NEUTRAL

 

 

L1

 

 

L1

Breakers

 

 

 

 

 

 

 

 

 

UTILITY

 

 

GROUND

UTILITY METER

 

 

 

L2

GRID

 

 

 

 

 

 

MAIN SERVICE PANEL

 

 

 

N

 

 

 

 

 

 

 

 

 

NOTES:

 

 

N

 

 

 

 

 

 

 

 

 

 

 

￿INSTALLER CONNECTIONS REQUIRED AT POINTS (A) AND (B) TO THE INVERTER ENCLOSURE.

￿ THE UTILITY METER MAY BE A

Buried copper wire if second ground rod is used

BI-DIRECTIONAL METER OR DUAL

 

METERS.

 

￿OBTAIN UTILITY COMPANY APPROVAL BEFORE INSTALLING.

Figure 2-14 Simplified electrical wiring diagram

2–20

975-0053-01-01