Startup Procedure
> 50 VDC
ACDC
VOLTS VOLTS
+–
Figure
Note: The Sun Tie XR is designed primarily for residential applications. For commercial applications where only 208 VAC is available, the Sun Tie XR may be installed with the appropriate use of a
1.Switch on the main 240 V breakers in the building’s electrical service panel.
2.Ensure all circuit breakers located in the Sun Tie XR unit are in the off (down) position.
3.Using an AC voltmeter, measure the AC open circuit utility voltage between L1 and L2, as shown in Figure
4.Switch on the ganged 15 amp Sun Tie XR circuit breakers located in the main electrical service panel. This applies the