Operation
Startup Procedure
Starting up the Sun Tie XR requires several steps. You will need to:
1.Check the PV array DC voltage.
2.Check the AC utility voltage.
3.Start up the Sun Tie by switching on the DC and AC circuit breakers inside the unit.
4.Reassemble the Sun Tie XR and replace the external covers.
Required EquipmentYou will need the following equipment to help you start up the
Sun Tie XR:
❐AC voltmeter (or multimeter)
❐DC voltmeter (or multimeter)
❐Frequency counter (optional)
WARNING: SHOCK HAZARD
Hazardous voltages present from two sources. Use extreme caution during startup procedure. Before applying power to the Sun Tie XR, ensure all AC and DC wiring is correct.
Checking the PV Array DC VoltageTo check the PV array DC voltage:1.Uncover the PV arrays and expose them to full sunlight. The sunlight must be intense enough to produce the required output voltage.
2.Measure the PV array open circuit DC voltage across the DC positive
(+) and negative
Note: Some thin film modules (amorphous) may produce open circuit voltages from
3. Switch on the PVGFP and DC breakers.