Mark the hole positions for the Manual Over-Ride lever on the door track or frame in a convenient position with the lever held in the horizontal position. Drill two M5 or 7/32nd of an inch size holes. (Pic 13).
Pic 13
Fit the M5 screws provided with the screw head on the inside of the track or doorframe. Fit the M5 nuts.
Secure the hook in the D-shackle of the over-ride cable. (Pic 14)
Pic 14
Adjust the Over-Ride Lever hook position to increase, or decrease tension by screwing it in or out of its bush, see Pic 12. The hook should be adjusted so that the lever is 90 degrees from the vertical when the cable slack is taken up. (Pic 15)