2.1INTRODUCTION
This section provides information detailing the system requirements and theory of operation of the Vanlink Control System. The following topics are discussed:
•Safety Recommendations
•System Requirements
•Theory of operation and recommendations
2.2SAFETY RECOMMENDATIONS
Equipment installation and operation should only be performed by qualified personnel that are familiar with the type of equipment being installed.
The following guidelines will help ensure your safety and protect the equipment from damage. However, these guidelines do not cover all potentially hazardous situations you might encounter during system installation. Refer also to the Safety Considerations of this guide for additional safety information.
•Always disconnect all power connections before installing or removing the Vanlink System and its associated components (i.e. the V750 Master Controller).
•Keep the rack and/or installation area clear and free of dust during and after installation.
•Keep tools and chassis components away from walk areas.
•Comply with all local safety laws and guidelines.
•Do not wear loose clothing, jewelry (including rings and chains), or other items that could get caught in the equipment. Fasten or remove loose ties, scarves, sleeves, and other items before you start installation procedures.
•Equipment grounding must meet local and national electrical codes.