Kyocera VLSG-01 Pan and Tilt Cabling and Connector Requirements, Typical Network Configuration

Page 26

INSTALLATION REQUIREMENTS

2.3.3.3Pan and Tilt Cabling and Connector Requirements

The pan and tilt cable and connector requirements are as follows (refer to Figure 2–2):

The pan/tilt controller is connected directly to the QPT pedestal on the roof via a terminal strip in the rear of the controller.

An additional four (4) wires are required for azimuth/elevation feedback.

The four (4) wires will connect to the V750 or to the pan/tilt controller depending on whether or not the model has feedback capability.

For installations using the C90VS-DC115A, the 4 wires will terminate at the 26p circular connector on the rear of the V750.

Twelve (12)

Wire Nycoil

Figure 2–2. Typical Network Configuration

User Manual 2-4

VanLink System featuring TouchStar™ Technology - Troll Systems Corporation

Document VLSG-01 - 10/21/08

Image 26
Contents VanLink System Installation Guide Troll Systems Corporation Table of Contents C100 User Interface Required Hardware SummaryVanlink Equipment Components Software RequirementsABBREVIATIONS, ACRONYMS, Terms Term DefinitionABBREVIATIONS, ACRONYMS, Terms Warranty PackagingConventions Used in this Document VanLink Component Set-up and OperationHints Hint This format is used for all hintsContact Information Introduction Hazard Advisory Placards/Signs General Safety PrecautionsDo Not Service or Adjust Alone VanLink Safety Considerations Electrical Power/Shock HazardsLifting/Handling Hazards Be Familiar With Resuscitation TechniquesCoincidental Damage to Equipment in Cabinets Electrostatic Discharge Sensitive Esds Components Safety Considerations S-5 Page VanLink System ENG Vehicle Configuration System OverviewVanLink System Features VanLink IMU ConfigurationRemote Control from the Studio or Control Center VanLink Remote Studio ConfigurationHardware Requirements SpecificationsRequired System Components Master Controller Software RequirementsSafety Recommendations IntroductionRack Installation Installation RequirementsPower Requirements Cable Requirements3.2 V750 Cable and Connector Requirements Running CablesPan and Tilt Cabling and Connector Requirements Typical Network Configuration3.4 GPS/IMU Connectivity Master Controllers and TNS AccessibilityIP Connectivity EVDO/3G Router ConnectivityTypical VanLink Network Configuration 1 GPS/IMU Mounting Considerations GPS/IMU AssemblyTypical Network Configuration for VanLink 5.1 GPS/IMU Mounting ConsiderationsGPS/IMU Assembly VanLink GPSMagnetometer Calibration CalibrationRemote and Local Control Antenna CalibrationOperating Requirements Transmitter Control / Available OptionsSection Engineering Drawings Page Page Page Page Page Page