2.3.3.1Running Cables

Cables should only be installed by qualified personnel who are familiar with the electrical requirements and safety precautions that are necessary to properly and safely install (run) these items.

The cables should be inspected prior to installation. Connectors should be visually inspected prior to connecting to their mating connector.

2.3.3.2V750 Cable and Connector Requirements

The V750 cable and connector requirements are as follows:

Cabling consisting of four (4) wires will be required between the V750 and the pan/tilt for azimuth and elevation feedback.

Some pan/tilts may already have the potentiometers installed in which case the wires needed may already be terminated and run through the NYCOIL.

The harness for the GPS/IMU can be extended to reach the roof of the vehicle if necessary.

Refer to Figure 2–1

p/n

TBD

Figure 2–1. Cable Connector/Adapters E-201-0101-01

VanLink System featuring TouchStar™ Technology - Troll Systems Corporation

Document VLSG-01 - 10/21/08

VanLink System Requirements 2-3

Image 25
Contents VanLink System Installation Guide Troll Systems Corporation Table of Contents C100 User Interface Vanlink Equipment Components SummaryRequired Hardware Software RequirementsTerm Definition ABBREVIATIONS, ACRONYMS, TermsABBREVIATIONS, ACRONYMS, Terms Packaging WarrantyVanLink Component Set-up and Operation Conventions Used in this DocumentHint This format is used for all hints HintsContact Information Introduction Do Not Service or Adjust Alone General Safety PrecautionsHazard Advisory Placards/Signs Electrical Power/Shock Hazards VanLink Safety ConsiderationsCoincidental Damage to Equipment in Cabinets Be Familiar With Resuscitation TechniquesLifting/Handling Hazards Electrostatic Discharge Sensitive Esds Components Safety Considerations S-5 Page System Overview VanLink System ENG Vehicle ConfigurationVanLink IMU Configuration VanLink System FeaturesVanLink Remote Studio Configuration Remote Control from the Studio or Control CenterRequired System Components SpecificationsHardware Requirements Master Controller Software RequirementsIntroduction Safety RecommendationsPower Requirements Installation RequirementsRack Installation Cable RequirementsRunning Cables 3.2 V750 Cable and Connector RequirementsTypical Network Configuration Pan and Tilt Cabling and Connector RequirementsIP Connectivity Master Controllers and TNS Accessibility3.4 GPS/IMU Connectivity EVDO/3G Router ConnectivityTypical VanLink Network Configuration Typical Network Configuration for VanLink GPS/IMU Assembly1 GPS/IMU Mounting Considerations 5.1 GPS/IMU Mounting ConsiderationsVanLink GPS GPS/IMU AssemblyRemote and Local Control CalibrationMagnetometer Calibration Antenna CalibrationTransmitter Control / Available Options Operating RequirementsSection Engineering Drawings Page Page Page Page Page Page