Emerson GXT3 230V Startup Checklist for the Liebert GXT3, Initial Startup and Electrical Checks

Page 27

Operation

8.0OPERATION

This section describes checks to be made before starting the UPS, how to start the UPS, manual battery test, manual bypass, shutting down the UPS and disconnecting the mains power from the UPS.

NOTE

The Liebert GXT3’s battery has been fully charged before delivery, but some charge will be lost during storage and shipping. To ensure that the battery has adequate reserve power to protect the connected load, charge the battery for three hours before putting the UPS into service.

8.1Startup Checklist for the Liebert® GXT3

Before starting the UPS, perform these checks:

___ 1. Check that the input plugs and loads are connected properly and reliably.

___ 2. Check that the battery cable is connected properly.

___ 3. Check that the communication cables are connected properly.

8.2Initial Startup and Electrical Checks

1.Verify that the Input Output circuit breakers are off.

2.During initial system checks, disconnect all loads (open load disconnects).

3.Inspect all wiring, cables and connection.

4.If external battery cabinets are used, verify that the battery interconnect cables are fully inserted in the sockets.

5.Place the manual bypass breaker in BYPASS position.

6.Turn on the branch circuit disconnect to apply voltage to the input terminal block.

7.Using a voltmeter, verify the expected L1-N voltage.

Verify that the same voltages appear at the Output terminals. The Bypass lamp by the switch will light.

8.After verifying proper input voltage to the UPS terminal block, turn off the branch circuit power, close all access panels to the distribution box and reapply input power.

9.Close the Input circuit breaker located on the distribution box. The green AC INPUT lamp should illuminate on the front panel.

10.Press the ON button for four seconds. After several seconds, the UPS ON lamp will turn on continuously. If the batteries are determined to be charged above 80%, an automatic battery test will run for about 15 seconds.

11.Close the Output circuit breaker on the rear of the power distribution box. The light by the input breaker will illuminate.

12.Return the manual breaker to the Inverter position. The output terminal block will be powered at this time.

13.Connect all loads for normal operation.

21

Image 27
Contents Liebert GXT3 230V,5000VA-UL Listed Page Table of Contents Communication MaintenanceTroubleshooting SpecificationsFigures Page Important Safety Instructions Information for the Protection of the Environment Glossary of Symbols Introduction System Description Rectifier/Power Factor Correction PFC CircuitBattery Charger InverterBattery DC-to-DC ConverterDynamic Bypass Main Frame and Electronics Major ComponentsLiebert GXT3 5000VA Terminal Block Communication Internal Battery Packs Removable Power Distribution BoxOuter Surface View Power Distribution Box Quick-Connect WHAT’S Included Connectors Spacers Support Bases Install the Main CabinetInstallation and Configuration Tower UPS InstallationQuantity Rack-Mount UPS InstallationInstalling the Adjustable Rack-Mount Kit-Sold Separately Operation and Display Panel Rotated Clockwise 90 DegreesRetaining latch UPS or battery813mm DepthUPS or battery cabinet Apply grease External Battery Cabinet InstallationTo remove Connect Input/Output PowerTo install Branch circuit breaker ratings HardwireTerminal Block ConnectionsElectrical specifications Distribution Box Electrical ConnectionsConfiguration Program Features Configuration ProgramWhat You Will Need ON/Alarm Silence/Manual Battery Test Button Controls and IndicatorsStandby/Manual Bypass Button Battery Level Indicators 5 Green Load Level Indicators 4 Green, 1 AmberUPS Status Indicators UPS status indicatorsUPS Status Indicator Icon Color Description Startup Checklist for the Liebert GXT3 Initial Startup and Electrical ChecksOperation Put the Liebert GXT3 in Manual Bypass Manual Battery TestDisconnecting Input Power from the Liebert GXT3 Maintenance BypassRemove Screws IT Power System Connectors IT Power System ConfigurationDry Contact Any Mode ShutdownBattery Mode Shutdown Communication Interface PortOn Battery Low BatteryLiebert IntelliSlot Communication Cards Remote Emergency Power Off Repo switch connection diagramLiebert MultiLink Replacing the Internal Battery Pack MaintenanceBattery Replacement Procedures Precautions Battery ChargingChecking UPS Functions Checking UPS StatusIndicator Diagnosis/Audible alarm UPS SymptomsTroubleshooting IndicatorsAudible Alarm Audible alarm descriptionCondition Alarm Problem Cause Solution Troubleshooting tableIlluminated UPS specifications SpecificationsOperating temperature parameters Power distribution specificationsExternal battery cabinet specifications Auto-Learning Battery Run Times Page Care Ne tIs t Twor k