Emerson 225-600KVA installation manual Liebert NX Battery System

Page 1

AC Power

For Business-Critical Continuity

Liebert® NXBattery System

Installation Manual–225-600kVA

Image 1
Contents Liebert NX Battery System Product Warranty Registration Table of Contents Figures Important Safety Instructions Liebert NX Preliminary Checks IntroductionEnvironmental Considerations Positioning Shipping bolts-Top-Terminal Battery CabinetClearances System CompositionLayout SafetyJunction Battery Attached Liebert Additional Junction BatteryAdditional Liebert Attached Additional Liebert Battery Cabinet Stand Alone Junction Power ConnectionCable Entry Grounding Control ConnectionAlber Monitoring System-Optional External Battery Room Temperature Sensor-OptionalBottom View Main components, Liebert Top-Terminal Battery Cabinet Do not DOUBLE-STACK Lugs Front Top View Front Ground BUS Detail Front View Outline Drawing Terminal DetailsLiebert NX Battery Cabinet control wiring Attached battery cabinet connections Typical Alber battery monitoring connections Battery Alber battery monitoring assembly connections Alber battery monitoring assembly diagramTop-Terminal battery configuration Cable Interconnect Diagram Left-Side Busbar Connections Right-Side Busbar Connections Liebert NX Battery Cabinet specifications SpecificationsAlber battery monitoring option specifications Liebert NX Junction Cabinet specificationsDC currents for Liebert NX modules Liebert NX Battery Cabinet approximate weights Liebert NX Battery Cabinet internal breakerUPS Rating KVA # Conduit Size, Ph, G Battery torque valuesTorque specifications, unless otherwise labeled Specifications Liebert NX Specifications Liebert NX Page Is t Ne tTwor k Care