Emerson 225-600KVA installation manual Terminal Details, Outline Drawing

Page 23

Installation Drawings

Figure 15 Liebert NX Attached Junction Cabinet—terminal detail and outline drawing

Terminal Details

WARNING!!!

Unit Removal and Unit Mobility Instructions Brackets MUST remain attached to the frame until such time that the unit is being located in its final installed position. (The final installation will always require the unit to be bolted to another Liebert NX

product.)

Failure to comply with these instructions could result in equipment damage and/or injury to personnel

38.3

 

(973)

 

7.9

 

(201)

15.5

 

( 393)

Front View

38.3

(973)

76.8

(1950)

15.1 ( 382)

33.5 ( 850)

Right Side

Outline Drawing

WARNING!!!

Unit Removal and Unit Mobility Instructions Brackets MUST remain attached to the frame until such time that the unit is being located in its final installed position. (The final installation will always require the unit to be bolted to another Liebert NX

product.)

Failure to comply with these instructions could result in equipment damage and/or injury to personnel

38.3

 

(973)

 

7.9

 

(201)

15.5

 

 

( 393 )

Front View

38.3 (973)

76.8

(1950)

15.1 ( 382 )

33.5 ( 850 )

Right Side

19

Liebert® NX

Image 23
Contents Liebert NX Battery System Product Warranty Registration Table of Contents Figures Important Safety Instructions Liebert NX Environmental Considerations IntroductionPreliminary Checks Positioning Shipping bolts-Top-Terminal Battery CabinetClearances System CompositionLayout SafetyAdditional Liebert Attached Attached Liebert Additional Junction BatteryJunction Battery Cable Entry Power ConnectionAdditional Liebert Battery Cabinet Stand Alone Junction Grounding Control ConnectionAlber Monitoring System-Optional External Battery Room Temperature Sensor-OptionalBottom View Main components, Liebert Top-Terminal Battery Cabinet Do not DOUBLE-STACK Lugs Front Top View Front Ground BUS Detail Front View Outline Drawing Terminal DetailsLiebert NX Battery Cabinet control wiring Attached battery cabinet connections Typical Alber battery monitoring connections Battery Alber battery monitoring assembly connections Alber battery monitoring assembly diagramTop-Terminal battery configuration Cable Interconnect Diagram Left-Side Busbar Connections Right-Side Busbar Connections Liebert NX Battery Cabinet specifications SpecificationsDC currents for Liebert NX modules Liebert NX Junction Cabinet specificationsAlber battery monitoring option specifications Liebert NX Battery Cabinet approximate weights Liebert NX Battery Cabinet internal breakerUPS Rating KVA # Conduit Size, Ph, G Battery torque valuesTorque specifications, unless otherwise labeled Specifications Liebert NX Specifications Liebert NX Page Care Ne tIs t Twor k