Emerson 225-600KVA installation manual Liebert NX Battery Cabinet control wiring

Page 24

Installation Drawings

Figure 16 Liebert NX Battery Cabinet control wiring

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CAN cable to be run

 

 

 

 

 

 

 

 

 

 

 

 

 

in trough closest to

 

 

 

 

 

 

 

 

 

 

 

 

 

the front of the unit

 

3-BRKR-POS

 

 

 

 

1- BRKR- NEG

 

 

 

 

 

 

Thermistor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Optional)

 

 

 

 

 

CONTACTAUX.1

CONTACTAUX.1

CONTACTAUX.1

 

Optional-TRIPUVR

Optional-TRIPUVR

 

 

Optional

 

(BLK)

 

(RED)

 

 

 

 

Battery

 

 

 

 

 

 

 

 

 

 

 

 

 

Voltage

 

 

 

 

 

 

 

 

 

 

 

 

 

Sense

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

1

2

3

 

 

1

2

3

4

5

 

NOTES

 

 

P1152

 

 

TB1150

 

 

 

 

 

 

 

 

 

1

USE WIRE TIE AS NECCESSARY FOR ROUTING AND

 

 

 

 

 

 

 

 

 

 

 

 

1

SECURING WIRE HARNESSES.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

This end field-connected

 

 

 

 

 

 

 

 

 

 

6

Liebert NX Battery Cabinet

 

 

P1153

 

 

 

 

 

 

7

to other cabinets

 

 

 

 

 

 

 

 

 

TB1151

Control Wiring Routing

 

 

 

 

 

 

 

 

 

 

 

 

 

TB1158

 

 

 

 

 

 

 

 

 

 

 

( BATTERY

 

 

 

 

 

 

 

BATTERY

 

 

 

MONITORING

 

 

 

 

 

 

 

 

 

SYSTEM )

 

 

 

 

 

 

 

INTERFACE

 

24V (RED)

 

 

 

 

 

 

 

 

 

 

 

BOARD (BIB)

 

GND (BLK)

 

 

 

 

 

 

 

 

 

 

 

 

 

CANH (WHT)

 

 

TB1154

 

 

 

 

 

TB1156

 

CANL (BLK)

 

 

4

3

2

1

 

 

 

 

2

1

 

 

 

 

 

 

 

 

 

 

 

 

(Belden 9156

 

CANL(BLK)

 

CANH(WHT) GND(BLK)

+24V(RED)

 

 

 

 

 

Control Wiring Diagram

 

CAN Cable

 

 

 

 

 

 

 

 

 

 

 

 

 

or Equivalent)

 

 

 

 

 

 

 

 

 

 

 

 

 

TROUGH

Liebert® NX

20

Image 24
Contents Liebert NX Battery System Product Warranty Registration Table of Contents Figures Important Safety Instructions Liebert NX Introduction Preliminary ChecksEnvironmental Considerations Shipping bolts-Top-Terminal Battery Cabinet PositioningSystem Composition ClearancesSafety LayoutAttached Liebert Additional Junction Battery Junction BatteryAdditional Liebert Attached Power Connection Additional Liebert Battery Cabinet Stand Alone JunctionCable Entry Control Connection GroundingExternal Battery Room Temperature Sensor-Optional Alber Monitoring System-OptionalBottom View Main components, Liebert Top-Terminal Battery Cabinet Do not DOUBLE-STACK Lugs Front Top View Front Ground BUS Detail Front View Terminal Details Outline DrawingLiebert NX Battery Cabinet control wiring Attached battery cabinet connections Typical Alber battery monitoring connections Battery Alber battery monitoring assembly diagram Alber battery monitoring assembly connectionsTop-Terminal battery configuration Cable Interconnect Diagram Left-Side Busbar Connections Right-Side Busbar Connections Specifications Liebert NX Battery Cabinet specificationsLiebert NX Junction Cabinet specifications Alber battery monitoring option specificationsDC currents for Liebert NX modules Liebert NX Battery Cabinet internal breaker Liebert NX Battery Cabinet approximate weightsBattery torque values UPS Rating KVA # Conduit Size, Ph, GTorque specifications, unless otherwise labeled Specifications Liebert NX Specifications Liebert NX Page Ne t Is tTwor k Care