Emerson 225-600KVA installation manual Alber battery monitoring assembly diagram

Page 28

Installation Drawings

Figure 21 Alber battery monitoring assembly diagram

 

FH2-1

 

 

 

FH2-2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FH2-1 FH2-2

Output A

Output B

Output C

FH2

Optional

A

ALBER BATTERY MONITORING XFMR

Detail A

 

 

 

 

 

 

 

This harness is intended for use only when

 

 

 

Secure supplied wire

 

 

 

 

 

 

 

battery cabinet is connected directly to UPS.

 

 

 

harness to busbar with

 

 

 

 

 

 

 

For all other instances, customer must supply wire.

supplied hardware.

Harness factory-installed.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wire Harness

 

 

Verify transformer connection

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Prior to startup.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

See diagram below.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V_OUT_A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F4

 

 

 

 

 

 

 

 

 

 

 

 

F75

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F5

 

 

 

 

 

 

 

 

 

 

 

 

F76

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NX BATTERY CABINET

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V_OUT_C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UPS MODULE OUTPUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOP TERMINALS

 

 

 

 

BOTTOM TERMINALS

 

 

 

 

 

 

 

 

 

 

 

 

FROM F5 FUSE IN BAT CAB

FROM F4 FUSE IN BAT CAB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

200 V

208 V

240 V

270 V

300 V

 

 

 

 

 

 

 

 

270 V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 V

 

0 V

 

 

 

200 V

208 V

240 V

300 V

 

 

 

 

 

XFMR CONNECTION DIAGRAM

 

 

X1

230 V

X2

 

 

 

 

 

 

Table 1

Alber battery monitoring assembly connections

 

 

 

 

 

 

 

 

Input

Alber Transformer-2

 

 

Alber Transformer-1

F4-F5

Voltage

(Wht)

Jumper

 

(Blk)

Fuse Rating

600

0 (Top)

300 (Top) to 0 (Bottom)

 

300 (Bottom)

2.25 A, 600VAC

 

 

 

 

 

 

480

0 (Top)

240 (Top) to 0 (Bottom)

 

240 (Bottom)

1.25 A, 600VAC

 

 

 

 

 

380

0 (Top)

300 (Top) to 208 (Bottom)

300 (Bottom)

1 A, 600VAC

 

 

 

 

 

208

0 (Top)

0 (Top) to 0 (Bottom) and

208 (Top)

0.75A, 600VAC

208 (Top) to 208 (Bottom)

 

 

 

 

Liebert® NX

24

Image 28
Contents Liebert NX Battery System Product Warranty Registration Table of Contents Figures Important Safety Instructions Liebert NX Preliminary Checks IntroductionEnvironmental Considerations Shipping bolts-Top-Terminal Battery Cabinet PositioningSystem Composition ClearancesSafety LayoutJunction Battery Attached Liebert Additional Junction BatteryAdditional Liebert Attached Additional Liebert Battery Cabinet Stand Alone Junction Power ConnectionCable Entry Control Connection GroundingExternal Battery Room Temperature Sensor-Optional Alber Monitoring System-OptionalBottom View Main components, Liebert Top-Terminal Battery Cabinet Do not DOUBLE-STACK Lugs Front Top View Front Ground BUS Detail Front View Terminal Details Outline DrawingLiebert NX Battery Cabinet control wiring Attached battery cabinet connections Typical Alber battery monitoring connections Battery Alber battery monitoring assembly diagram Alber battery monitoring assembly connectionsTop-Terminal battery configuration Cable Interconnect Diagram Left-Side Busbar Connections Right-Side Busbar Connections Specifications Liebert NX Battery Cabinet specificationsAlber battery monitoring option specifications Liebert NX Junction Cabinet specificationsDC currents for Liebert NX modules Liebert NX Battery Cabinet internal breaker Liebert NX Battery Cabinet approximate weightsBattery torque values UPS Rating KVA # Conduit Size, Ph, GTorque specifications, unless otherwise labeled Specifications Liebert NX Specifications Liebert NX Page Ne t Is tTwor k Care