Fujitsu RX200 S5 manual Processors, Installing a second processor

Page 23

5 Processors

VCAUTION!

Follow the safety instructions in the chapter “Safety instructions” on page 13.

VCAUTION!

Processors are modules which can react extremely sensitively to electro- static discharges and which must therefore always be handled with care.

After a processor has been removed from its protective sleeve or from its socket, place it with its smooth side down on a non-conducting, antistatic surface.

Never push a processor over a surface.

5.1Installing a second processor

The system board can be upgraded with a second processor.

VCAUTION!

Only processors of the same type may be used on the system board. The second processor must have the same clock frequency as the first. For dual operation, use a suitable multiprocessor operating system.

ÊOpen the server as described in chapter “Preparation” on page 19.

ÊLift the air cowl upwards to remove it as described in section “Removing the air cowl” on page 22.

RX200 S5

Options Guide

23

Image 23
Contents Primergy RX200 S5 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Documentation overview PrefaceConcept and target groups Further sources of information Documentation overview PrefaceExpansions and conversions TPM Expansions and conversions PrefaceNotational conventions Page Procedure Page Safety instructions Before starting up Installation and operationOptions Guide Batteries Never remove parts of the CD/DVD drive casing Working with CDs/DVDs and CD/DVD drivesLaser information ESD label Modules with electrostatic-sensitive componentsPulling out/removing the server PreparationRemoving the fan cover Removing the housing coverOpening the server Opening the server PreparationOpening the server Removing the air cowl Preparation Removing the air cowlProcessors Installing a second processorInserting the processor Installing a second processorProcessors Installing the heat sinkReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Equipping rules Independent Channel ModeMirrored Channel Mode Equipping rulesMain memory Performance Channel ModeSpare Channel Mode Extending/replacing the main memory Removing installed memory modulesExtending/replacing the main memory Inserting a memory module Inserting memory modulesPage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing the DVD drive or dummy module Removing an existing DVD drive or dummy moduleDemounting the DVD drive cage Removing the DVD drive cageRemoving the existing backplane 6x HDD Installing the backplane 8x HDDInstalling the HDD drive cage Installing the drive cage for 8x HDDInserting the HDD modules HDD #6 HDD #7Expansion cards and iBBU Installing an expansion card in riser cardsRemoving the riser card holders Installing an expansion card in riser cardsInstalling an expansion card Riser card holder #2 with riser card Riser card holder equipped with a controller Reinstalling the riser card holdersExpansion cards and iBBU Installing a modular RAID controllerInstalling a RAID controller Installing the riser card holderInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller Position of the uSSD on the system board USB solid state disk uSSDPage Trusted Platform Module TPM Installing the TPM modulePage Fitting the air cowl CompletionFitting the air cowl Dimm CPU #1Completion Fan #3/#4 Fan #1/#2Fan #11/#12 Fit the fan cover see Removing the fan cover on Closing the serverPage Description From CablingCabling overview Cable diagrams Cabling Cable diagramsCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index