Fujitsu RX200 S5 manual Cabling overview, Description From

Page 67

13 Cabling

13.1Cabling overview

No.

Part no.

Description

From

To

 

 

 

 

 

1

A3C40102683

Front VGA cable

Front panel board

System board

 

 

 

 

 

2

A3C40102687

SATA cable ODD

Optical Disk Drive

1. SATA

 

 

 

(ODD)

connection

 

 

 

 

(system board)

 

 

 

 

2. HDD

 

 

 

 

backplane

 

 

 

 

 

3

A3C40102656

SAS HDD cable

Onboard SATA

HDD backplane

 

 

 

connection or RAID

(CN1 or CN2)

 

 

 

controller in slot 3

 

 

 

 

 

 

4

A3C40102678

Front panel cable

The control panel

System board

 

 

 

 

 

5

T26139-

iBBU cable

iBBU

RAID controller

 

Y3987-V2

 

 

 

 

 

 

 

 

Table 1: Cabling overview

RX200 S5

Options Guide

67

Image 67
Contents Primergy RX200 S5 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Concept and target groups PrefaceDocumentation overview Further sources of information Documentation overview PrefaceExpansions and conversions TPM Expansions and conversions PrefaceNotational conventions Page Procedure Page Safety instructions Before starting up Installation and operationOptions Guide Batteries Laser information Working with CDs/DVDs and CD/DVD drivesNever remove parts of the CD/DVD drive casing ESD label Modules with electrostatic-sensitive componentsPulling out/removing the server PreparationRemoving the fan cover Removing the housing coverOpening the server Opening the server PreparationOpening the server Removing the air cowl Preparation Removing the air cowlProcessors Installing a second processorInserting the processor Installing a second processorProcessors Installing the heat sinkReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Equipping rules Independent Channel ModeMirrored Channel Mode Equipping rulesSpare Channel Mode Performance Channel ModeMain memory Extending/replacing the main memory Removing installed memory modulesExtending/replacing the main memory Inserting a memory module Inserting memory modulesPage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing the DVD drive or dummy module Removing an existing DVD drive or dummy moduleDemounting the DVD drive cage Removing the DVD drive cageRemoving the existing backplane 6x HDD Installing the backplane 8x HDDInstalling the HDD drive cage Installing the drive cage for 8x HDDInserting the HDD modules HDD #6 HDD #7Expansion cards and iBBU Installing an expansion card in riser cardsInstalling an expansion card Installing an expansion card in riser cardsRemoving the riser card holders Riser card holder #2 with riser card Riser card holder equipped with a controller Reinstalling the riser card holdersExpansion cards and iBBU Installing a modular RAID controllerInstalling a RAID controller Installing the riser card holderInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller Position of the uSSD on the system board USB solid state disk uSSDPage Trusted Platform Module TPM Installing the TPM modulePage Fitting the air cowl CompletionFitting the air cowl Dimm CPU #1Completion Fan #3/#4 Fan #1/#2Fan #11/#12 Fit the fan cover see Removing the fan cover on Closing the serverPage Cabling overview CablingDescription From Cable diagrams Cabling Cable diagramsCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index