Fujitsu RX200 S5 manual Cable diagrams Cabling

Page 68

Cable diagrams

Cabling

13.2Cable diagrams

13.2.1 Cabling for up to 4 HDD modules

 

VGA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Front-

panel

 

 

DVD drive

CN2

 

CN1

 

 

 

Back-

plane

6x HDD

 

 

 

 

 

 

 

 

 

 

 

CN3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

distribution

 

P2

Front Panel

Fan

1/2

SATA

ODD

Fan

3/4

 

Fan

5/6

 

 

Fan

7/8

Fan

9/10

 

 

 

Fan

11/12

 

Power

board

P1P3

PWR

 

 

 

 

 

 

 

 

 

CPU 2

 

 

 

DIMM 2D

DIMM 1D

DIMM 2E

DIMM 1E

DIMM 2F

DIMM 1F

 

 

PWR CTRL

 

 

SATA1

 

 

 

 

 

 

 

 

Data

 

 

 

 

 

 

 

 

 

 

Slot 3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PSU 1

 

 

PSU 2

 

uSSD

 

 

 

 

 

 

DIMM 1C

DIMM 2C

DIMM 1B

DIMM 2B

DIMM 1A

DIMM 2A

 

 

 

CPU 1

 

 

SAS

 

 

 

 

 

VGA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SATA

 

 

 

 

 

Front

 

 

iRMC

 

Slot 2

 

 

TPM

 

 

Slot 1

 

 

 

 

System Board

D2786

Power

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Key:

Figure 41: Cable diagram for 4 HDD modules with onboard SATA controller

68

Options Guide

RX200 S5

Image 68
Contents Primergy RX200 S5 Server Comments… Suggestions… Corrections… Certified documentation according to DIN EN ISOContents Contents Documentation overview PrefaceConcept and target groups Documentation overview Preface Further sources of informationExpansions and conversions Expansions and conversions Preface TPMNotational conventions Page Procedure Page Safety instructions Installation and operation Before starting upOptions Guide Batteries Never remove parts of the CD/DVD drive casing Working with CDs/DVDs and CD/DVD drivesLaser information Modules with electrostatic-sensitive components ESD labelPreparation Pulling out/removing the serverRemoving the housing cover Opening the serverOpening the server Preparation Removing the fan coverOpening the server Removing the air cowl Removing the air cowl PreparationInstalling a second processor ProcessorsInstalling a second processor Inserting the processorInstalling the heat sink ProcessorsReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Independent Channel Mode Mirrored Channel ModeEquipping rules Equipping rulesMain memory Performance Channel ModeSpare Channel Mode Extending/replacing the main memory Removing installed memory modulesExtending/replacing the main memory Inserting memory modules Inserting a memory modulePage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing an existing DVD drive or dummy module Removing the DVD drive or dummy moduleRemoving the DVD drive cage Demounting the DVD drive cageInstalling the backplane 8x HDD Removing the existing backplane 6x HDDInstalling the drive cage for 8x HDD Installing the HDD drive cageHDD #6 HDD #7 Inserting the HDD modulesInstalling an expansion card in riser cards Expansion cards and iBBURemoving the riser card holders Installing an expansion card in riser cardsInstalling an expansion card Riser card holder #2 with riser card Reinstalling the riser card holders Riser card holder equipped with a controllerInstalling a modular RAID controller Installing a RAID controllerInstalling the riser card holder Expansion cards and iBBUInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller USB solid state disk uSSD Position of the uSSD on the system boardPage Installing the TPM module Trusted Platform Module TPMPage Completion Fitting the air cowlDimm CPU #1 Fitting the air cowlFan #3/#4 Fan #1/#2 CompletionFan #11/#12 Closing the server Fit the fan cover see Removing the fan cover onPage Description From CablingCabling overview Cable diagrams Cable diagrams CablingCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index