Fujitsu RX200 S5 manual Installing a second processor, Inserting the processor

Page 24

Installing a second processor

Processors

Inserting the processor

2

3

1

Figure 6: Releasing the lever

ÊRelease the socket lever by pressing it sideways and pushing it upwards as far as it will go (1).

ÊOpen the cover (2).

ÊRemove the plastic cover (3).

2

3

1

Figure 7: Inserting the processor

ÊPosition the new processor over the socket and then place it carefully into the socket (1).

VCAUTION!

The processor can only be installed in one particular direction. Note the marking on one of the corners. To avoid damaging the processor, do not force it into the socket.

ÊClose the cover (2).

ÊLock the processor in place in the socket by returning the socket lever to its original position (3).

24

Options Guide

RX200 S5

Image 24
Contents Primergy RX200 S5 Server Comments… Suggestions… Corrections… Certified documentation according to DIN EN ISOContents Contents Preface Concept and target groupsDocumentation overview Documentation overview Preface Further sources of informationExpansions and conversions Expansions and conversions Preface TPMNotational conventions Page Procedure Page Safety instructions Installation and operation Before starting upOptions Guide Batteries Working with CDs/DVDs and CD/DVD drives Laser informationNever remove parts of the CD/DVD drive casing Modules with electrostatic-sensitive components ESD labelPreparation Pulling out/removing the serverRemoving the housing cover Opening the serverOpening the server Preparation Removing the fan coverOpening the server Removing the air cowl Removing the air cowl PreparationInstalling a second processor ProcessorsInstalling a second processor Inserting the processorInstalling the heat sink ProcessorsReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Independent Channel Mode Mirrored Channel ModeEquipping rules Equipping rulesPerformance Channel Mode Spare Channel ModeMain memory Removing installed memory modules Extending/replacing the main memoryExtending/replacing the main memory Inserting memory modules Inserting a memory modulePage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing an existing DVD drive or dummy module Removing the DVD drive or dummy moduleRemoving the DVD drive cage Demounting the DVD drive cageInstalling the backplane 8x HDD Removing the existing backplane 6x HDDInstalling the drive cage for 8x HDD Installing the HDD drive cageHDD #6 HDD #7 Inserting the HDD modulesInstalling an expansion card in riser cards Expansion cards and iBBUInstalling an expansion card in riser cards Installing an expansion cardRemoving the riser card holders Riser card holder #2 with riser card Reinstalling the riser card holders Riser card holder equipped with a controllerInstalling a modular RAID controller Installing a RAID controllerInstalling the riser card holder Expansion cards and iBBUInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller USB solid state disk uSSD Position of the uSSD on the system boardPage Installing the TPM module Trusted Platform Module TPMPage Completion Fitting the air cowlDimm CPU #1 Fitting the air cowlFan #3/#4 Fan #1/#2 CompletionFan #11/#12 Closing the server Fit the fan cover see Removing the fan cover onPage Cabling Cabling overviewDescription From Cable diagrams Cable diagrams CablingCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index