Fujitsu RX200 S5 manual Riser card holder #2 with riser card

Page 49

Expansion cards and iBBU Installing an expansion card in riser cards

1

Figure 26: Riser card holder #2 with riser card

ÊRemove the rear cover (1) from the riser card holder.

IKeep the rear cover for future use.

If you remove the expansion card, you must replace the rear cover to comply with EMC regulations and to satisfy cooling requirements and fire protection measures.

RX200 S5

Options Guide

49

Image 49
Contents Primergy RX200 S5 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Concept and target groups PrefaceDocumentation overview Further sources of information Documentation overview PrefaceExpansions and conversions TPM Expansions and conversions PrefaceNotational conventions Page Procedure Page Safety instructions Before starting up Installation and operationOptions Guide Batteries Laser information Working with CDs/DVDs and CD/DVD drivesNever remove parts of the CD/DVD drive casing ESD label Modules with electrostatic-sensitive componentsPulling out/removing the server PreparationOpening the server Removing the housing coverOpening the server Preparation Removing the fan coverOpening the server Removing the air cowl Preparation Removing the air cowlProcessors Installing a second processorInserting the processor Installing a second processorProcessors Installing the heat sinkReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Mirrored Channel Mode Independent Channel ModeEquipping rules Equipping rulesSpare Channel Mode Performance Channel ModeMain memory Extending/replacing the main memory Removing installed memory modulesExtending/replacing the main memory Inserting a memory module Inserting memory modulesPage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing the DVD drive or dummy module Removing an existing DVD drive or dummy moduleDemounting the DVD drive cage Removing the DVD drive cageRemoving the existing backplane 6x HDD Installing the backplane 8x HDDInstalling the HDD drive cage Installing the drive cage for 8x HDDInserting the HDD modules HDD #6 HDD #7Expansion cards and iBBU Installing an expansion card in riser cardsInstalling an expansion card Installing an expansion card in riser cardsRemoving the riser card holders Riser card holder #2 with riser card Riser card holder equipped with a controller Reinstalling the riser card holdersInstalling a RAID controller Installing a modular RAID controllerInstalling the riser card holder Expansion cards and iBBUInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller Position of the uSSD on the system board USB solid state disk uSSDPage Trusted Platform Module TPM Installing the TPM modulePage Fitting the air cowl CompletionFitting the air cowl Dimm CPU #1Completion Fan #3/#4 Fan #1/#2Fan #11/#12 Fit the fan cover see Removing the fan cover on Closing the serverPage Cabling overview CablingDescription From Cable diagrams Cabling Cable diagramsCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index