Fujitsu RX200 S5 manual Installing an iBBU

Page 52

Installing an iBBU

Expansion cards and iBBU

ÊClose the server, connect all power plugs to the power outlets, and switch on the server as described in chapter “Completion” on page 61.

9.3Installing an iBBU

If a modular RAID 5 controller is installed in riser card #3, you can add an iBBU (intelligent Battery Backup Unit) to it.

1

2

Figure 29: iBBU installation kit

1Connection cable from the iBBU to the RAID 5 controller

2iBBU

ÊOpen the server as described in chapter “Preparation” on page 19.

52

Options Guide

RX200 S5

Image 52
Contents Primergy RX200 S5 Server Comments… Suggestions… Corrections… Certified documentation according to DIN EN ISOContents Contents Concept and target groups PrefaceDocumentation overview Documentation overview Preface Further sources of informationExpansions and conversions Expansions and conversions Preface TPMNotational conventions Page Procedure Page Safety instructions Installation and operation Before starting upOptions Guide Batteries Laser information Working with CDs/DVDs and CD/DVD drivesNever remove parts of the CD/DVD drive casing Modules with electrostatic-sensitive components ESD labelPreparation Pulling out/removing the serverRemoving the housing cover Opening the serverOpening the server Preparation Removing the fan coverOpening the server Removing the air cowl Removing the air cowl PreparationInstalling a second processor ProcessorsInstalling a second processor Inserting the processorInstalling the heat sink ProcessorsReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Independent Channel Mode Mirrored Channel ModeEquipping rules Equipping rulesSpare Channel Mode Performance Channel ModeMain memory Extending/replacing the main memory Removing installed memory modulesExtending/replacing the main memory Inserting memory modules Inserting a memory modulePage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing an existing DVD drive or dummy module Removing the DVD drive or dummy moduleRemoving the DVD drive cage Demounting the DVD drive cageInstalling the backplane 8x HDD Removing the existing backplane 6x HDDInstalling the drive cage for 8x HDD Installing the HDD drive cageHDD #6 HDD #7 Inserting the HDD modulesInstalling an expansion card in riser cards Expansion cards and iBBUInstalling an expansion card Installing an expansion card in riser cardsRemoving the riser card holders Riser card holder #2 with riser card Reinstalling the riser card holders Riser card holder equipped with a controllerInstalling a modular RAID controller Installing a RAID controllerInstalling the riser card holder Expansion cards and iBBUInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller USB solid state disk uSSD Position of the uSSD on the system boardPage Installing the TPM module Trusted Platform Module TPMPage Completion Fitting the air cowlDimm CPU #1 Fitting the air cowlFan #3/#4 Fan #1/#2 CompletionFan #11/#12 Closing the server Fit the fan cover see Removing the fan cover onPage Cabling overview CablingDescription From Cable diagrams Cable diagrams CablingCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index