Fujitsu RX200 S5 manual Contents

Page 3

Contents

1

Preface

5

1.1

Concept and target groups

5

1.2

Documentation overview

5

1.3

Expansions and conversions

7

1.4

Notational conventions

9

2Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

3Safety instructions . . . . . . . . . . . . . . . . . . . . . . . 13

4Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

4.1Pulling out/removing the server . . . . . . . . . . . . . . . . 19

4.2Opening the server . . . . . . . . . . . . . . . . . . . . . . . 20

4.3Removing the air cowl . . . . . . . . . . . . . . . . . . . . . 22

5 Processors . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

5.1Installing a second processor . . . . . . . . . . . . . . . . . 23

5.2Replacing the processor . . . . . . . . . . . . . . . . . . . . 26

5.3

Replacing the heat sink

29

6

Main memory

31

6.1Equipping rules . . . . . . . . . . . . . . . . . . . . . . . . . 32

6.2Extending/replacing the main memory . . . . . . . . . . . . 34

7

Accessible drive . . . . . . . . . . . . . . . . . . . . . . . . 37

RX200 S5

Operating Manual

Image 3
Contents Primergy RX200 S5 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Preface Concept and target groupsDocumentation overview Further sources of information Documentation overview PrefaceExpansions and conversions TPM Expansions and conversions PrefaceNotational conventions Page Procedure Page Safety instructions Before starting up Installation and operationOptions Guide Batteries Working with CDs/DVDs and CD/DVD drives Laser informationNever remove parts of the CD/DVD drive casing ESD label Modules with electrostatic-sensitive componentsPulling out/removing the server PreparationRemoving the fan cover Removing the housing coverOpening the server Opening the server PreparationOpening the server Removing the air cowl Preparation Removing the air cowlProcessors Installing a second processorInserting the processor Installing a second processorProcessors Installing the heat sinkReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Equipping rules Independent Channel ModeMirrored Channel Mode Equipping rulesPerformance Channel Mode Spare Channel ModeMain memory Removing installed memory modules Extending/replacing the main memoryExtending/replacing the main memory Inserting a memory module Inserting memory modulesPage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing the DVD drive or dummy module Removing an existing DVD drive or dummy moduleDemounting the DVD drive cage Removing the DVD drive cageRemoving the existing backplane 6x HDD Installing the backplane 8x HDDInstalling the HDD drive cage Installing the drive cage for 8x HDDInserting the HDD modules HDD #6 HDD #7Expansion cards and iBBU Installing an expansion card in riser cardsInstalling an expansion card in riser cards Installing an expansion cardRemoving the riser card holders Riser card holder #2 with riser card Riser card holder equipped with a controller Reinstalling the riser card holdersExpansion cards and iBBU Installing a modular RAID controllerInstalling a RAID controller Installing the riser card holderInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller Position of the uSSD on the system board USB solid state disk uSSDPage Trusted Platform Module TPM Installing the TPM modulePage Fitting the air cowl CompletionFitting the air cowl Dimm CPU #1Completion Fan #3/#4 Fan #1/#2Fan #11/#12 Fit the fan cover see Removing the fan cover on Closing the serverPage Cabling Cabling overviewDescription From Cable diagrams Cabling Cable diagramsCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index