Fujitsu RX200 S5 manual Expansions and conversions

Page 7

Preface

Expansions and conversions

1.3Expansions and conversions

Second processor

The system board can be upgraded with a second processor. Only processors of the same type may be used on the system board. The second processor must have the same clock frequency as the first.

Main memory expansion

The system board supports up to 96 GB of main memory. 6 slots (2 banks with 3 channels each) are provided for each CPU for the main memory.

Accessible drive

In the version with a maximum of six HDD modules, a 5.25 inch bay is available for a DVD drive (SATA interface) with a height of 0.5 inches.

Extending the number of HDD modules

You can add further HDD modules, if required. The server can accommodate a maximum of eight HDD modules. To do this, you may need to exchange the HDD backplane.

Expansion cards in the PCI slots

The system board offers two slots with a PCI Express x8 interface and one slot with a PCI Express x4 interface (exclusively for modular RAID controllers):

Expansion cards can only be installed using three-slot riser cards. The riser cards provide three slots at a right angle to the system board (two slots for PCIe controllers and one slot for a RAID controller).

Intelligent Battery Backup Unit

You can add an iBBU (intelligent Battery Backup Unit) to the optional modular RAID controller to ensure data integrity in the event of a power failure.

uSSD

You can insert a USB solid state disk on the system board at a later time.

RX200 S5

Options Guide

7

Image 7
Contents Primergy RX200 S5 Server Certified documentation according to DIN EN ISO Comments… Suggestions… Corrections…Contents Contents Concept and target groups PrefaceDocumentation overview Further sources of information Documentation overview PrefaceExpansions and conversions TPM Expansions and conversions PrefaceNotational conventions Page Procedure Page Safety instructions Before starting up Installation and operationOptions Guide Batteries Laser information Working with CDs/DVDs and CD/DVD drivesNever remove parts of the CD/DVD drive casing ESD label Modules with electrostatic-sensitive componentsPulling out/removing the server PreparationRemoving the fan cover Removing the housing coverOpening the server Opening the server PreparationOpening the server Removing the air cowl Preparation Removing the air cowlProcessors Installing a second processorInserting the processor Installing a second processorProcessors Installing the heat sinkReplacing the processor Replacing the processorReplacing the processor Replacing the processor Replacing the heat sink Page Main memory Equipping rules Independent Channel ModeMirrored Channel Mode Equipping rulesSpare Channel Mode Performance Channel ModeMain memory Extending/replacing the main memory Removing installed memory modulesExtending/replacing the main memory Inserting a memory module Inserting memory modulesPage Accessible drive Installing a Sata DVD drive Installing a Sata DVD driveInstalling a Sata DVD drive Page HDD modules Removing the DVD drive or dummy module Removing an existing DVD drive or dummy moduleDemounting the DVD drive cage Removing the DVD drive cageRemoving the existing backplane 6x HDD Installing the backplane 8x HDDInstalling the HDD drive cage Installing the drive cage for 8x HDDInserting the HDD modules HDD #6 HDD #7Expansion cards and iBBU Installing an expansion card in riser cardsInstalling an expansion card Installing an expansion card in riser cardsRemoving the riser card holders Riser card holder #2 with riser card Riser card holder equipped with a controller Reinstalling the riser card holdersExpansion cards and iBBU Installing a modular RAID controllerInstalling a RAID controller Installing the riser card holderInstalling an iBBU Installing an iBBUInstalling an iBBU Installing the iBBU IBBU Routing the cable Connecting the cable to the modular RAID 5 controller Position of the uSSD on the system board USB solid state disk uSSDPage Trusted Platform Module TPM Installing the TPM modulePage Fitting the air cowl CompletionFitting the air cowl Dimm CPU #1Completion Fan #3/#4 Fan #1/#2Fan #11/#12 Fit the fan cover see Removing the fan cover on Closing the serverPage Cabling overview CablingDescription From Cable diagrams Cabling Cable diagramsCabling for up to 6 HDD modules Cabling for up to 8 HDD modules Index