Chapter 2 Switch Installation
Connecting to Power
Figure 2-8 Installing the Ground-Lug Screws (Two Single Ring Terminals)
16TC
331555
1
1
Ground cable
Step 7 Attach the other end of the ground wire to a grounded bare metal surface, such as a ground bus, a grounded DIN rail, or a grounded bare rack.
Connecting the Power Converter to an AC Power Source
These sections describe the steps required to connect the power converter to an AC power source:
•Preparing the AC Power Connection, page
•Connecting the AC Power Source to the Power Converter, page
Preparing the AC Power Connection
To connect the power converter to an AC power source, you need an AC power cord. Power cord connector types and standards vary by country.
Note Use copper conductors only, rated at a minimum temperature of 167°F (75°C).
|
| Cisco IE 2000 Switch Hardware Installation Guide |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|