Cisco Systems IE20004TSB, IE20004TSL Applying Power to the Power Converter, Running Boot Fast

Page 60

Chapter 2 Switch Installation

Connecting to Power

Step 7 Use a ratcheting torque flathead screwdriver to tighten the power connector captive screws (above the installed wire leads) to 2 in-lb (0.23 N-m).

1

332022

1—Power connector captive screws

Step 8 Connect the other end of the positive wire to the positive terminal on the DC power source, and connect the other end of the return wire to the return terminal on the DC power source.

Step 9 Insert the wired power plug into the switch PoE power connector and tighten the two screws to secure the plug.

Applying Power to the Power Converter

Move the circuit breaker for the AC outlet or the DC control circuit to the on position.

The LED on the power converter front panel is green when the unit is operating normally. The LED is off when the unit is not powered or is not operating normally. After the power is connected, the switch automatically begins the power-on self- test (POST), a series of tests that verifies that the switch functions properly.

Running Boot Fast

When the switch powers on, it automatically initiates a boot fast sequence. The boot fast sequence allows the switch to boot up in less than 60 seconds. To test the switch, follow the steps in these sections:

Powering On the Switch, page 2-30

Verifying Boot Fast, page 2-31

Disconnecting Power, page 2-31

Powering On the Switch

To apply power to a switch that is directly connected to a DC power source, locate the circuit breaker on the panel board that services the DC circuit, and switch the circuit breaker to the ON position.

 

Cisco IE 2000 Switch Hardware Installation Guide

2-30

OL-25818-04

Image 60
Contents Cisco IE 2000 Switch Hardware Installation Guide Americas HeadquartersPage N T E N T S Installation Guidelines Connecting to a Dual-Purpose Port Verifying Switch Operation IP Settings Audience PurposeConventions Related Publications Product Overview Switch Models Model Description Software ImageModel Description Software Image Model Description Software Image Front Panel Cisco IE-2000-4TS-L Front Panel ViewCisco IE-2000-8TC-L Front Panel Cisco IE-2000-16TC-L Front Panel View Cisco IE-2000-16PTC-G-E Switch Front Panel View 10/100BASE-T Downlink Ports10/100BASE-T Uplink Ports 10/100/1000BASE-T Uplink Ports100 Mb/s SFP Module Uplink Slots 100/1000 Mb/s SFP Module Uplink SlotsDual-Purpose Gigabit Ethernet Uplink Ports SFP ModulesType of SFP Module Model Power Connectors GLC-LH-SMAlarm Connector PoE Power ConnectorManagement Ports USB Mini-Type B PortLEDs on the Cisco IE 2000 Switch LEDsExpress Setup LED System LEDUSB-Mini Console LED Alarm LEDs Power Status LEDsPort Status LEDs Dual-Purpose Port LEDs Dual-Purpose Port LEDsFlash Memory Card PoE Status LEDColor PoE Status 10 Flash Memory Card Slot Rear Panel Management OptionsNetwork Configurations Switch Installation Preparing for Installation140F 60C Statement Hazardous Area Installation Warnings 1080 Installation Guidelines North American Hazardous Location ApprovalEnvironment and Enclosure Guidelines General Guidelines Installing or Removing the Flash Memory Card Optional Verifying Package ContentsInstalling the Flash Memory Card in the Switch Connecting to a Console Port RJ-45 Console Port USB Mini-Type B Console PortConnecting the Console Cable RJ-45 Console PortUSB Mini-Type B Console Port Removing the USB Mini-Type B Console Port CoverChoose Start Control Panel Systems Connecting to Power Supported Power SuppliesTools and Equipment Grounding the Switch DimensionsAttachable? UsageSlide the ground screw through the terminal Ground cable Connecting the Power Converter to an AC Power Source Preparing the AC Power ConnectionConnecting the AC Power Source to the Power Converter Connecting AC PowerConnecting the Power Converter to a DC Power Source Wiring the DC Power Source Statement 12 Stripping the Power Connection Wire Label14 Inserting Wires in the Power Connector 15 Torquing the Power Connector Captive Screws Attaching the Power Connectors to the Switch 16 Completed DC Power Connections on the Power Connectors17 Attaching the Power Connectors to the Switch 18 Connecting the Power Connectors to the Switch Connecting Power to the Switch PoE DC-Input Optional 332021 Applying Power to the Power Converter Running Boot FastPowering On the Switch Installing the Switch Verifying Boot FastDisconnecting Power Installing the Switch on a DIN Rail DIN Rail SwitchRemoving the Switch from a DIN Rail Connecting Alarm Circuits Wiring the Protective Ground and DC Power for Alarm CircuitsWiring the External Alarms Label Connection21 Removing the Alarm Connector 332225 Attaching the Alarm Connector to the Switch Connecting Destination Ports 25 Connecting the Alarm Connector to the SwitchConnecting to 10/100 and 10/100/1000 Ports 26 Connecting to an Ethernet Port Installing and Removing SFP Modules Installing SFP Modules into SFP Module Slots28 Installing an SFP Module into an SFP Module Slot Removing SFP Modules from SFP Module SlotsConnecting to SFP Modules LC connector Connecting to a Dual-Purpose Port Verifying Switch Operation Where to Go NextSwitch Installation Where to Go Next Diagnosing Problems Switch Boot FastSwitch LEDs Switch ConnectionsBad or Damaged Cable Ethernet and Fiber-Optic CablesInterface Settings 10/100 and 10/100/1000 Port ConnectionsSFP Module Ping End DeviceSwitch Performance Speed, Duplex, and AutonegotiationAutonegotiation and Network Interface Cards Cabling DistanceResetting the Switch How to Recover PasswordsFinding the Switch Serial Number Serial Number Location for the Cisco IE-2000 SwitchesTechnical Specifications Operating Temperature SpecificationsTechnical Specifications Power RequirementsEnvironmental Ranges Table A-2 Cisco IE 2000 Series Technical Specifications Physical Dimensions Table A-2 Cisco IE 2000 Series Technical Specifications Alarm Ratings Alarm Ratings SpecificationHazardous Locations Standards Hazardous Locations StandardsConnector Specifications 10/100 PortsSFP Module Connectors Dual-Purpose PortsConsole Port Alarm Port Figure B-5 USB Type A-to-USB 5-Pin Mini-Type B CableCables and Adapters SFP Module CablesCore Modal Wavelength Commercial SFPsMHz/km1 Cable Distance Extended temperature SFPs Bandwidth Type of SFP Module Nanometers Fiber TypeCable Pinouts TP3Console Port Adapter Pinouts Figure B-9Switch Console RJ-45-to-DB-25 Port DTE Adapter Device DSR DTR CTS RTSOL-25818-04 Accessing the CLI Through the Console Port Removing the USB Mini-Type B Console Port CoverFigure C-1 Removing the USB Mini-Type B Console Port Cover Figure C-2 Connecting the Console Cable Figure C-3 Connecting the USB-Mini Console Cable Installing the Cisco Microsoft Windows USB Device Driver Installing the Cisco Microsoft Windows XP USB DriverInstalling the Cisco Microsoft Windows 2000 USB Driver Uninstalling the Cisco Microsoft Windows USB Driver Using the Add or Remove Programs UtilityEntering the Initial Configuration Information IP SettingsCompleting the Setup Program Enter an enable password, and press Return These choices appear