Installation
Step 7: Finishing Up
At this point, the track and connectivity box must be secured to the floor, the electrical power must be connected, and the AAP sockets must be populated.
To complete the installation of the AVTrac, follow these instructions:
Ensure cables lay flat
Fit cover track
Cut the carpet or carpet tiles so that they run up to but do not cover the aluminum track (see the diagram below).
NCut the carpet to abut the edge of the cover track. Do not align the cuts to the edge of the ramps as this will leave a gap between the end of the carpet and the cover track.
Cut carpet
Carpet covers ramps but not track.
AVTrac • Installation | 16 |