Extron electronic 42-122-xx manual Connectivity box

Page 23

10.00"

(25.4 cm)

4.91" (12.47cm)

TOP VIEW

10.00"

(25.4 cm)

3.55" (9.02 cm)

SIDE VIEW

Connectivity box

4.91"

(12.47 cm)

3.55" (9.02 cm)

.67" (1.70 cm)

2.98"

(7.57 cm)

END VIEW

AVTrac • Reference Material

21

Image 23
Contents AVTrac Installation GuideSicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisAVTrac Floor System IntroductionOverview Kit Contents Kit Contents In-Wall Cable Routing Considerations Before Getting StartedPlanning Floor ConsiderationsAVTrac maximum slope is Wheelchair AccessibilityRoom Considerations Before Getting Started, cont’d Tools and Equipment Required for InstallationCut prelaid carpet roll to expose concrete InstallationFloor Remove carpet tiles to expose concreteMark wall Cut cable access hole in wallWall Measure and cut track TrackCut aluminum base track Pre-drill holes to secure connectivity box Track, cont’dPre-drill holes in track and ramps Positions of mounting holesScrew side ramps to floor Mate side ramp to base trackDrill into concrete and screw down track Secure connectivity box to the floor Connectivity BoxConnect wires to AC receptacle Power ModuleConnect AC conduit to junction box Power Module cont’dAttach AC power module Connect double isolated cable to junction boxRun cable to AAPs Install AAPsAAPs Cut carpet Finishing UpEnsure cables lay flat Fit cover trackAttach carpet tile to track raceway Refit carpetUse template to cut base board Reattach base board to wall Finishing up cont’d AVTrac installedReference Material SpecificationsAVTrac 480R Cont’dConnectivity box USA Universal AC Compatibility GuidePassive AAPs Optional AccessoriesTrack Accessories Active AAPsReference Material Extron’s Warranty Before Getting Started Quick Installation Checklist