Extron electronic 42-122-xx manual Finishing up cont’d, AVTrac installed

Page 20

Installation

Step 7: Finishing up cont’d

The installed AVTrac safely and discretely runs power, data, and A/V cables from a wall to a table, podium, or other furniture.

AVTrac installed

18AVTrac • Installation

Image 20
Contents Installation Guide AVTracPrecautions Safety Instructions EnglishConsignes de Sécurité Français Sicherheitsanleitungen DeutschAVTrac Floor System IntroductionOverview Kit Contents Kit Contents Before Getting Started PlanningFloor Considerations In-Wall Cable Routing ConsiderationsAVTrac maximum slope is Wheelchair AccessibilityRoom Considerations Tools and Equipment Required for Installation Before Getting Started, cont’dInstallation FloorRemove carpet tiles to expose concrete Cut prelaid carpet roll to expose concreteMark wall Cut cable access hole in wallWall Measure and cut track TrackCut aluminum base track Track, cont’d Pre-drill holes in track and rampsPositions of mounting holes Pre-drill holes to secure connectivity boxScrew side ramps to floor Mate side ramp to base trackDrill into concrete and screw down track Connectivity Box Secure connectivity box to the floorPower Module Connect wires to AC receptaclePower Module cont’d Attach AC power moduleConnect double isolated cable to junction box Connect AC conduit to junction boxRun cable to AAPs Install AAPsAAPs Finishing Up Ensure cables lay flatFit cover track Cut carpetAttach carpet tile to track raceway Refit carpetUse template to cut base board Reattach base board to wall AVTrac installed Finishing up cont’dSpecifications Reference MaterialCont’d AVTrac 480RConnectivity box Universal AC Compatibility Guide USAOptional Accessories Track AccessoriesActive AAPs Passive AAPsReference Material Extron’s Warranty Quick Installation Checklist Before Getting Started