3.1 Diamond-VT Components
The
Immediately upon receipt, check the shipping carton for damage from mishandling. Contact us at once via the means that is easiest for you (see Warranty on page
The front of the
rear of the unit holds the host interface cards, power supplies and blower assemblies.
CAUTION
All modular components must be replaced by qualified personnel only. Refer to Hot Swap Operating Instructions on page 69.
Floor model
The management system card is at the top front of the case. At its center is a
LEDs to the port’s right indicate fault, unit ready, host interface cards A and B installation status, and the power status for each power supply.
Below the management system card are individual disk drive sleds which also have LEDs for each drive’s status. Each sled contains two hard drives. Up to 24 hard drives may be installed on the 12 sleds. Empty bays should be covered by blank faceplates
or empty sleds. Access is provided by loosening two screws and gently pulling on the sled handle.
On the rear of the unit are blowers which support hard drive, cabinet and power supply cooling. The blowers are held in by removable screws. Correct operation is displayed by a LED at the top of each panel.
The power supplies for the
Between the power supplies and blower assemblies are two slots that hold the Host Interface cards. The HIC is the connection point into the
7
ATTO Technology Inc. Diamond Storage Array Installation and Operation Manual