Sigma projetor manual Quarterly and Annual Maintenance for Source Guide Tubes

Page 46

MAINTENANCE INSTRUCTIONS

Connect the RETRACT control housing to the control crank housing. Retract the control cable fully, watching for any binding that may indicate damage to the control housing.

If applicable, reset the odometer to zero with the control cable fully retracted.

Replace the protective rubber cap over the end of the safety connector assembly.

Quarterly and Annual Maintenance for Source Guide Tubes

Tools required for maintenance of source guide tubes:

A424-9XL mock source assembly to perform function tests after cleaning and inspection.

Length of clean control cable to push A424-9 XL through a 7 ft (2.1 m) source guide tube.

1 in-18 tap and 1 in-18 die for male and female threads of the source guide tubes, if required.

Materials required for maintenance of source guide tubes:

Solvent: Clean mineral spirits to clean the source guide tubes internally.

Clean lint-free cloths and detergent to clean the exterior of the source guide tubes.

Mil-spec grease MIL-G-23827B (or C), MIL-PRF-23827C (or equivalent radiation resistant grease) to lubricate the swage fittings on the source guide tubes.

Source of compressed air and hand nozzle to blow dry the internal conduit of the source guide tubes.

3M™ yellow polyvinyl tape (or black polyvinyl electrical tape) for repair of cuts in the source guide tubes.

Source Guide Tube Maintenance

1Clean the exterior of all the source guide tubes thoroughly using clean cloths and a detergent. Remove all of dirt, grease and grime from the yellow polyvinyl source guide tubes and the swage fittings.

2Clean the interior of each source guide tube by pouring 4-5 oz (100 ml) of clean solvent into one end. Manipulate the source guide tube back and forth to cause the solvent to wash the interior of the entire length of source guide tube. Pour the solvent into a used solvent container. Refill the source guide tube with clean solvent and repeat the cleaning operation. Repeat this cleaning process until the solvent poured out of the source guide tube into the used solvent container is clean. Use a compressed-air hose to blow out any residual solvent from the source guide tubes. Use of a clean white cloth attached to one end of the source guide tube will trap any debris or residual solvent when blowing out the source guide tubes. Repeat the cleaning process until the cloth ‘trap’ indicates dirt is not present within the source guide tubes.

3Carefully inspect the entire length of each source guide tube for cuts and melted areas. Repairs to cut or melted areas can be accomplished by taping the area with 3M™ yellow polyvinyl tape (or black polyvinyl electrical tape). Taping the damaged area of the polyvinyl sheath will prevent the ingress of water and other liquid that would cause corrosion to the remote control cable. Carefully look and feel for dents and depressions in the source guide tubes. Even a small inward dent in the source guide tube could cause a seized source assembly resulting in emergency operations. A ‘mock’ (Model A424-9XL) source assembly attached to a section of control cable that is pushed through the entire length of source guide tube provides additional confirmation the source guide tube suitable for use.

4.15

Image 46
Contents Operating and Maintenance Manual MAN-027-MayTime Page Front View Exposure Device Description Model 880 Sigma authorized contents Standard Source AssemblyModel 880 Delta authorized contents ApplicationsSource output Model 880 Elite authorized contentsModel 880 Omega authorized contents Selected attenuation dataSource Guide Tube with source stop Control Specifications Complete Remote Control AssembliesSource Guide Tube Extension Weight of Depleted Uranium Shield Exposure Device Specifications Manufacturer LengthWeight of Exposure Device Type BU Certification Primary Application WidthSource Assembly Maintenance RequirementsDevice Operating Temperature Range ConstructionWarranty and Limitation of Liability Distance Job site safety precautions InstrumentsRestricted Area ShieldingExposure Device Survey Source Guide Tube projection sheath LayoutSimultaneously pull and rotate Remote Control Conduit Layout Unlock the plunger lock with the key Important Warning Checks Before Exposure of the Source 1Unlocking Projecting Confirmatory Survey RetractingLocking the Exposure Device Surveying Dismantling equipment Remote control unitSource guide tubes StorageOperational Features Source Assembly IntroductionSource assembly and remote control cable connectors Exposure DeviceDaily Inspection Instructions Transit Mode Exposure ModeDaily Inspection of the System Daily Inspection of the Exposure DeviceDaily Inspection of the Remote Controls Daily Inspection of the Source Guide TubesRemote Control Inspection Important WarningControl Conduit Inspection Control Cable InspectionImportant Reminder Maintenance Instructions Routine Quarterly Maintenance Requirements Remote Controls Radiographic Exposure DeviceMisconnect Test Routine Quarterly Maintenance Records Annual Maintenance RequirementsLeak Testing Leak Test of the Radioactive Sealed Source Leak Test for Depleted Uranium DUAnnual Maintenance for the Model 880 Series Exposure Devices Model 880 Series Annual Maintenance Requirements Maintenance Instructions Maintenance Instructions Maintenance Instructions Annual Maintenance for the Remote Controls Remote Control Maintenance RequirementsMaintenance Instructions Maintenance Instructions Re-assembly of the Remote Control Unit Quarterly and Annual Maintenance for Source Guide Tubes Source Guide Tube MaintenanceMaintenance Instructions Annual Maintenance Records Considerations of Safety Class a ItemsRear Plate Assembly Rear Plate Assembly Front Plate Assembly Front Plate Assembly Control Assemblies Source Guide Tubes Control Assemblies 222 Transport Package Sample Transportation InstructionsReceipt of Radioactive Material Shipment of Radioactive Material Maximum Radiation Sample Transportation Instructions Sample Transportation Instructions Shipment of Empty Uranium Shielded Containers Sample Transportation Instructions Carriage of Radioactive Material Sample Transportation Instructions Radioactive material transport checklist Apparatus for industrial gamma radiography Area alarmAlarm ratemeter Automatic securing mechanismLocked position Remote controlExposure head Maximum ratingSource changers Source holderWorking position Emergencies TrainingEU Regulations Access to Restricted AreasUnited States Regulations Personnel MonitoringDisposal Abc