Sigma projetor manual Routine Quarterly Maintenance Records, Annual Maintenance Requirements

Page 35

MAINTENANCE INSTRUCTIONS

Routine (Quarterly) Maintenance Records

Records of all equipment inspected and maintained during the routine maintenance must be recorded. Records should indicate:

The date of inspection and maintenance.

Name and signature of the qualified individual performing the required inspections.

Problems found and maintenance or repairs performed.

Model number and serial number of the exposure device and transport container.

Associated equipment that was inspected and maintained.

Part numbers and associated lot numbers or serial numbers of replacement parts installed.

Annual Maintenance Requirements

Radiographic exposure devices used under normal environmental conditions should only require complete maintenance once a year. Complete maintenance on the associated equipment including the remote controls and source guide tubes should be performed every three months to detect deficiencies and to prevent corrosion and wear related problems.

The complete maintenance of the exposure device requires the disassembly of the exposure device to enable a detailed inspection of all major components. Therefore, the inspection and maintenance requires transfer of the source assembly from the exposure device into a source changer performed inside of a restricted area. The annual inspection and maintenance must be performed by individuals specifically trained, qualified and authorized for this work.

Perform the following steps to transfer the sealed source from the exposure device into a source changer:

1Perform a survey of the exposure device to ensure measurable dose rates are less than

2 mSv/hr (200 mR/hr) and less than 20 µSv/hr (2 mR/hr) at 1 meter (to comply with ANSI/ISO requirements) when loaded to maximum capacity. Perform a radiation survey and an inspection of the source changer to be used according to the source changer's operating instructions manual.

2Perform a daily inspection of the remote controls, source guide tube and exposure device according to the daily inspection section of this manual. If the source assembly connector fails the NO GO gauge test, do not proceed with transfer of the source assembly. Contact a QSA Global, Inc. service center for advice on disposition of the source assembly.

Use the Model 550 NO GO gauge to check the remote control cable connector before and after a connection to the source assembly connector. For complete instructions to use the NO GO gauge and points tested (review the daily inspection instructions).

Do not use remote controls that do not meet the inspection criteria described in the daily inspection.

3Set up the equipment within a restricted area before transferring the source assembly into the source changer according to the instructions supplied with the source changer. The transfer must be performed by properly trained and licensed personnel. Use a survey meter to perform confirmatory surveys of the exposure device, source guide tube and source changer to confirm that the sealed source is properly secured. Engage the lock on the source changer to lock the sealed source within the source changer.

Remove the source identification tag from the exposure device and fasten it to the source changer.

Attach a Model 550 connector gauge (jumper) to the end of the remote control cable connector found inside of the protective cover of the locking mechanism. The jumper will allow removal of the remote controls from the locking mechanism of the device after the remote control cable connector is returned to the exposure device lock.

4.4

Image 35
Contents MAN-027-May Operating and Maintenance ManualTime Page Front View Exposure Device Description Applications Standard Source AssemblyModel 880 Delta authorized contents Model 880 Sigma authorized contentsSelected attenuation data Model 880 Elite authorized contentsModel 880 Omega authorized contents Source outputSource Guide Tube Extension Control Specifications Complete Remote Control AssembliesSource Guide Tube with source stop Primary Application Width Exposure Device Specifications Manufacturer LengthWeight of Exposure Device Type BU Certification Weight of Depleted Uranium ShieldConstruction Maintenance RequirementsDevice Operating Temperature Range Source AssemblyWarranty and Limitation of Liability Shielding Job site safety precautions InstrumentsRestricted Area DistanceSource Guide Tube projection sheath Layout Exposure Device SurveySimultaneously pull and rotate Remote Control Conduit Layout Unlock the plunger lock with the key Important Warning Checks Before Exposure of the Source 1Unlocking Projecting Locking the Exposure Device RetractingConfirmatory Survey Storage Dismantling equipment Remote control unitSource guide tubes SurveyingIntroduction Operational Features Source AssemblyExposure Device Source assembly and remote control cable connectorsDaily Inspection Instructions Exposure Mode Transit ModeDaily Inspection of the Exposure Device Daily Inspection of the SystemDaily Inspection of the Source Guide Tubes Daily Inspection of the Remote ControlsImportant Warning Remote Control InspectionControl Cable Inspection Control Conduit InspectionImportant Reminder Maintenance Instructions Radiographic Exposure Device Routine Quarterly Maintenance Requirements Remote ControlsMisconnect Test Annual Maintenance Requirements Routine Quarterly Maintenance RecordsLeak Test for Depleted Uranium DU Leak Testing Leak Test of the Radioactive Sealed SourceAnnual Maintenance for the Model 880 Series Exposure Devices Model 880 Series Annual Maintenance Requirements Maintenance Instructions Maintenance Instructions Maintenance Instructions Remote Control Maintenance Requirements Annual Maintenance for the Remote ControlsMaintenance Instructions Maintenance Instructions Re-assembly of the Remote Control Unit Source Guide Tube Maintenance Quarterly and Annual Maintenance for Source Guide TubesMaintenance Instructions Considerations of Safety Class a Items Annual Maintenance RecordsRear Plate Assembly Rear Plate Assembly Front Plate Assembly Front Plate Assembly Control Assemblies Source Guide Tubes Control Assemblies 222 Sample Transportation Instructions Transport PackageReceipt of Radioactive Material Shipment of Radioactive Material Maximum Radiation Sample Transportation Instructions Sample Transportation Instructions Shipment of Empty Uranium Shielded Containers Sample Transportation Instructions Carriage of Radioactive Material Sample Transportation Instructions Radioactive material transport checklist Automatic securing mechanism Area alarmAlarm ratemeter Apparatus for industrial gamma radiographyMaximum rating Remote controlExposure head Locked positionWorking position Source holderSource changers Training EmergenciesPersonnel Monitoring Access to Restricted AreasUnited States Regulations EU RegulationsDisposal Abc