Chapter 2
Installation
This chapter contains the following sections:
“Reviewing Safety Precautions” on page 22
“Selecting a Site for the Switch” on page 24
“Cable Specifications” on page 25
“Unpacking the Switch” on page 26
“Installing the Switch on a Table or a Desktop” on page 27
“Installing the Switch in an Equipment Rack” on page 28
“Installing Optional SFP Transceivers” on page 35
“Cabling the Switch” on page 39
“Powering On the Switch” on page 41
“Monitoring the Initialization Processes” on page 43
21