All Countries: Install product in accordance with local and National Electrical Codes.  E8

Circuit Overloading: Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.  E21

Warning

Mounting of the equipment in the rack should be such that a hazardous condition is not created due to uneven mechanical loading.  E25

If installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment may be greater than the room ambient temperature. Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient temperature (Tmra).  E35

Caution

Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised.  E36

Warning

Reliable earthing of rack-mounted equipment should be maintained. Particular attention should be given to supply connections other than direct connections to the branch circuits (e.g., use of power strips).

E37

23

Image 33
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications