Allied Telesis AT-X210-16GT, AT-X210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack

Page 41

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

6.Mount an AT-x210-16GT switch in a 19-inchequipment rack using the provided spacer bracket mounts with four equipment rack screws (not provided with the switch), as shown in Figure 20.

RESET FAULT

STANDBY

POWER

CONSOLE

 

 

 

 

 

 

 

 

 

MODE

 

L/A

 

 

 

 

RS-232

SELECT

SPEED

1

MODE

LINK/

 

 

 

 

 

 

3

 

SPEED/

ACT

 

 

 

 

DUPLEX

 

5

7

DUPLEX

 

 

 

 

4

 

9

11

 

 

 

 

 

2

 

 

 

 

 

 

 

 

6

8

13

15R

L/A

 

 

 

 

 

 

 

 

 

 

 

10

12

 

MODE

 

 

 

 

 

 

 

 

 

 

 

 

 

14

16R

L/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODE

1

3

5

7

2 9

4 11

6 13

8 15R

10 12 14 16R

L/A

15

LINK/ 16 ACT

ATGi -

 

 

x210

 

gabit

-

Ether

 

 

16GTtch

15 SFP

net Swi

 

 

 

 

16

Figure 20. Mounting an AT-x210-16GT Switch in an Equipment Rack

31

Image 41
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications