Allied Telesis AT-X210-9GT, AT-X210-24GT Mounting an AT-x210-24GT Switch in an Equipment Rack

Page 39

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

4.Mount an AT-x210-24GT switch in a 19-inch equipment rack using four equipment rack screws (not provided with the switch).

RESET FAULT

 

 

FAULT

CONSOLE

STANDBY

POWER

STANDBY

 

 

MODE

 

 

 

 

MODE

 

 

 

RS-

SELECT

 

 

 

 

SELECT SPEED

11

 

 

RS232-232

 

SPEED

33

 

 

 

 

 

55

 

 

DUPLEX

22

44

 

 

 

 

 

66

 

 

 

 

 

 

 

L/AL/A

 

 

MODMOEDE

77

99

 

 

8

8

10

 

LINK

 

LINK/

/

SPEED

/

11

 

 

11

13

12

14

 

ACTACT

 

 

DUPLEX

 

 

 

15R

 

 

 

15R 17

 

 

 

17

19

 

16R

 

21

23R

18

 

 

20

 

 

 

22

24R

 

 

 

L/A MODE L/A MODE

1

 

 

 

3

 

 

 

55

 

 

 

77

 

 

2

 

99

 

 

 

 

4

 

1111

 

66

 

 

 

1313

 

8

 

 

8

15R

 

 

 

 

 

15R

 

 

 

1010

1717

 

 

1212

 

 

1919

 

 

1414

 

 

2121

 

 

16R

 

 

23R

 

 

16R

 

 

 

23R

 

 

 

1818

 

 

 

2020

 

 

 

2222

 

 

 

24R

 

 

 

24R

1515 1616 2323 2424

L/A L/A

LINK/

 

 

15LINK

/

ACTACT

15

 

ATGi -

 

 

gabitx210

 

Ether

-

1616

 

24GTtch

 

net Swi

2323

 

SFPSFP

 

2424

 

 

Figure 17. Mounting an AT-x210-24GT Switch in an Equipment Rack

29

Image 39
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications