Allied Telesis AT-X210-24GT, AT-X210-9GT manual Mounting an AT-x210-9GT Switch in an Equipment Rack

Page 43

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

9.Next attach the cable tray brackets for AT-x210-9GT switches, as shown below in Figure 23.

Figure 23. Attaching cable tray brackets for an AT-x210-9GT

10.Mount an AT-x210-9GT switch in a 19-inch equipment rack, as shown below in Figure 24, using the screws from the rubber feet after removing these screws, as shown earlier in Figure 15.

RESET

FAULT

 

 

POWER

STANDBY

CONSOLE

 

 

RS-

MODE

232

SELECT

SPEED

 

 

DUPLEX

L/A MODE

1

2

LINK/ SPEED/

3

5

4

6

ACT

 

DUPLEX

7

L/A

 

MODE

8

L/A

 

MODE

1

3

5

7 2

4

6

8

L/A

ATGi -

 

x210

gabit

-

Ethernet

 

Sw9GTitch

SFP

LINK/

 

ACT

 

 

9

Figure 24. Mounting an AT-x210-9GT Switch in an Equipment Rack

33

Image 43
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications