Allied Telesis AT-X210-9GT, AT-X210-24GT, AT-X210-16GT manual Installing Optional SFP Transceivers

Page 45

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

Installing Optional SFP Transceivers

To install an SFP transceiver, perform the following procedure:

Note

The transceiver can be hot-swapped; you do not need to power off the switch to install a transceiver. However, always remove the cables before removing the transceiver.

Note

You should always install the transceiver before connecting the fiber optic cables to it.

1.Remove the transceiver from its shipping container and store the packaging material in a safe location.

Warning

An SFP transceiver can be damaged by static electricity. Be sure to observe all standard electrostatic discharge (ESD) precautions, such as wearing an antistatic wrist strap, to avoid damaging the transceiver.

2. Remove the dust plug from an SFP slot. See Figure 27.

R

R

1982

Figure 27. Removing the Dust Plug from an SFP Slot

3. Position the SFP transceiver with the label facing up.

35

Image 45
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications