Allied Telesis AT-X210-9GT, AT-X210-24GT, AT-X210-16GT manual Switch Initialization Messages

Page 54

Chapter 2: Installation

Starting base/loopback...

[

OK

]

Starting base/sysctl...

[

OK

]

Received event poefw.done

 

 

 

Starting base/portmapper...

[

OK

]

Received event syslog.done

 

 

 

Starting base/reboot-stability...

[

OK

]

Starting base/autofs-card...

[

OK

]

Checking system reboot stability...

[

OK

]

Starting base/cron...

[

OK

]

Starting base/appmond...

[

OK

]

Starting hardware/openhpi...

[

OK

]

Starting hardware/timeout...

[

OK

]

Starting base/inet...

[

OK

]

Starting base/modules...

[

OK

]

Received event modules.done

 

 

 

Received event board.inserted

 

 

 

Received event hardware.done

 

 

 

Starting network/startup...

[

OK

]

Starting network/stackd...

[

OK

]

Starting network/election.timeout...

[

OK

]

Received event network.enabled

 

 

 

Initializing HA processes:

 

 

 

openhpid, hostd, cntrd, nsm, auth, epsr, hsl

 

 

 

imiproxyd, irdpd, lldpd, loopprot, mstp

 

 

 

rmon, sflowd, imi, lacp

 

 

 

Received event network.initialized

 

 

 

Assigning Active Workload to HA processes:

 

 

 

hsl, nsm, rmond, sflowd, irdpd, lacpd

 

 

 

lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd

 

 

 

Received event network.activated

 

 

 

Loading default configuration

Warning: flash:/default.cfg does not exist, loading factory defaults.

..

Figure 35. Switch Initialization Messages (Continued)

44

Image 54
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Overview ChapterFeatures SFP SlotsPage Package Contents Front and Back Panels AT-x210-9GTAT-x210-9GT Management Software Twisted Pair Ports Power LEDsStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Cable Specifications Type of CableUnpacking the Switch Installing the Switch on a Table or a Desktop Installing the Switch in an Equipment Rack Speed DuplexMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Switch Initialization Messages Monitoring the Initialization ProcessesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Technical Specifications Appendix aPhysical Specifications Environmental SpecificationsPower Specifications Connectors and Port Pinouts Pin SignalPin Pair Signal Appendix a Technical Specifications