Allied Telesis AT-X210-24GT, AT-X210-9GT, AT-X210-16GT manual Figures

Page 7

Figures

Figure 1: AT-x210-9GT,AT-x210-16GT, and AT-x210-24GT packaging

8

Figure 2: AT-x210-9GT,AT-x210-16GT, and AT-x210-24GT Front Panels

9

Figure 3: MODE LED Toggle button

10

Figure 4: AT-x210-9GT,AT-x210-16GT, and AT-x210-24GT Back Panels

10

Figure 5: POWER LED on AT-x210-9GT

13

Figure 6: FAULT LED on AT-x210-9GT

14

Figure 7: FAULT LED on AT-x210-16GT

14

Figure 8: AT-x210-9GT Link/Activity and Speed LEDs

15

Figure 9: AT-x210-16GT Link/Activity/Speed LEDs

16

Figure 10: AT-x210-24GT Link/Activity/Speed Port LED

16

Figure 11: AT-x210-9GT SFP Speed and Link/Activity LEDs

17

Figure 12: AT-x210-16GT SFP Status LEDs

18

Figure 13: AT-x210-24GT SFP Status LEDs

18

Figure 14: Attaching the Rubber Feet

27

Figure 15: Turning the Switch Upside Down

28

Figure 16: Attaching brackets to an AT-x210-24GT

28

Figure 17: Mounting an AT-x210-24GT Switch in an Equipment Rack

29

Figure 18: Attaching the brackets level with the front of an AT-x210-16GT

30

Figure 19: Close up showing a bracket positioned for an AT-x210-9GT

30

Figure 20: Mounting an AT-x210-16GT Switch in an Equipment Rack

31

Figure 21: Fitting rack mount handles to the brackets for an AT-x210-9GT

32

Figure 22: Fitting brackets to the mounting for an AT-x210-9GT

32

Figure 23: Attaching cable tray brackets for an AT-x210-9GT

33

Figure 24: Mounting an AT-x210-9GT Switch in an Equipment Rack

33

Figure 25: Mounting an AT-x210-9GT Switch in an Equipment Rack

34

Figure 26: Securing cables to the cable tray for an AT-x210-9GT

34

Figure 27: Removing the Dust Plug from an SFP Slot

35

Figure 28: Inserting the SFP on an AT-x210-24GT

36

Figure 29: Inserting the SFP on an AT-x210-16GT

36

Figure 30: Positioning the SFP Handle in the Upright Position

37

Figure 31: Ejecting an SFP transceiver after lowering the SFP Handle to the Downwards Position

37

Figure 32: Lifting the AC Power Cable Hook on an AT-x210-16GT Switch

41

Figure 33: Plugging in the AC Power Cord on an AT-x210-16GT Switch

41

Figure 34: Switch Initialization Messages

43

Figure 35: Switch Initialization Messages (Continued)

44

Figure 36: Switch Initialization Messages (Continued)

45

Figure 37: RJ-45 Connector and Port Pin Layout

54

v

Image 7
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications