Allied Telesis AT-X210-24GT, AT-X210-9GT manual Installing the Switch on a Table or a Desktop

Page 37

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

Installing the Switch on a Table or a Desktop

You can install AT-x210-16GT and AT-x210-24GT switches on a desktop, or in a standard 19-inch equipment rack. To install AT-x210-16GT and AT- x210-24GT switches in a rack, see “Installing the Switch in an Equipment Rack” on page 28. The AT-x210-9GT is rack mountable using an optional AT-x210-9GT rack mount kit (Part Number: 990-003904-00).Separate installation instructions are included with the AT-x210-9GT rack mount kit.

Here are the guidelines to selecting a suitable site for desktop or table use:

ˆThe table should be level and stable and the power outlets should be located near the switches and be easily accessible.

ˆThe site should allow for easy access to the ports on the front of the switches, so that you can easily connect and disconnect cables, and view the port LEDs.

ˆThe site should not expose the switches to moisture or water and the site should be a dust-free environment.

ˆThe site should include dedicated power circuits or power conditioners to supply reliable electrical power to the network devices.

ˆThe rubber feet on the bottom of the switches should be left on for table or desktop installation.

If you switch does not already have rubber feet fitted, fit these as follows:

1.Remove all equipment from the package and store the packaging material in a safe place.

2.Turn the switch over and place it on a table.

3.Screw the four rubber feet to the bottom of the switch as shown below:

1971

Figure 14. Attaching the Rubber Feet

4.Turn the switch over again and place it on a flat, secure surface (such as a desk or table) leaving ample space around the unit for ventilation.

5.Go to “Installing Optional SFP Transceivers” on page 35 or “Cabling the Switch” on page 39.

27

Image 37
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications