Allied Telesis AT-X210-16GT, AT-X210-9GT, AT-X210-24GT Monitoring the Initialization Processes

Page 53

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

Monitoring the Initialization Processes

It takes about thirty seconds for the switch to initialize its management software programs and features, and load the default configuration.

You may also monitor the bootup sequence by connecting a terminal or computer that has a terminal emulator program, to the Console port on the master switch. You will see the messages in Figure 34 here to Figure 36 on page 45.

Bootloader 2.0.10

loaded

 

 

 

 

Press <Ctrl+B> for the Boot Menu

 

 

 

Reading filesystem...

 

 

 

 

Loading flash:x210-5.4.3.rel

 

 

 

Verifying release... OK

 

 

 

 

Booting...

 

 

 

 

 

Starting base/first...

 

[

OK

]

Mounting virtual filesystems...

[

OK

]

 

______________

____

 

 

 

 

/\ \

/ /______\

 

 

 

/

\ \_

__/ / ______

 

 

 

/

\

/

______

 

 

 

/

\ \

/ /

\ ____ /

 

 

 

/______/\____\ \/ /____________/

 

 

 

Allied Telesis Inc.

 

 

 

 

AlliedWare Plus (TM) v5.4.3

 

 

 

Current release filename: x210-5.4.3.rel

 

 

 

Original release filename: x210-5.4.3.rel

 

 

 

Built: Tue Jul 9 18:20:42 NZST 2013 by: maker@maker04-build

 

 

Mounting static filesystems...

[

OK

]

Checking flash filesystem...

[

OK

]

Mounting flash filesystem...

[

OK

]

Checking NVS filesystem...

[

OK

]

Mounting NVS filesystem...

[

OK

]

Starting base/dbus...

 

[

OK

]

Starting base/syslog...

 

[

OK

]

Figure 34. Switch Initialization Messages

43

Image 53
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications