Allied Telesis AT-X210-16GT, AT-X210-9GT, AT-X210-24GT manual Contents

Page 5

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

Contents

Preface

1

Symbol Conventions

2

Contacting Allied Telesis

3

Chapter 1: Overview

 

Features

6

Twisted Pair Ports

6

SFP Slots

6

LEDs

7

Installation Options

7

Power Conservation

7

MAC Address Table

7

Package Contents

8

Front and Back Panels

9

Management Software

11

Twisted Pair Ports

12

LEDs

13

POWER/FAULT/STANDBY LEDs

13

10Base-T/100Base-TX/1000Base-T Link Activity LEDs

15

SFP LEDs

17

Power Supply

19

Chapter 2: Installation

 

Reviewing Safety Precautions

22

Selecting a Site for the Switch

24

Cable Specifications

25

Unpacking the Switch

26

Installing the Switch on a Table or a Desktop

27

Installing the Switch in an Equipment Rack

28

Installing Optional SFP Transceivers

35

Cabling the Switch

39

Powering On the Switch

41

Monitoring the Initialization Processes

43

Chapter 3: Troubleshooting

 

Appendix A:

 

Physical Specifications

52

Dimensions

52

Weight

52

Environmental Specifications

52

Power Specifications

53

Electrical Safety and Electromagnetic Emissions Certifications

53

Connectors and Port Pinouts

54

iii

Image 5
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Chapter OverviewSFP Slots FeaturesPage Package Contents AT-x210-9GT Front and Back PanelsAT-x210-9GT Management Software Twisted Pair Ports LEDs PowerStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Type of Cable Cable SpecificationsUnpacking the Switch Installing the Switch on a Table or a Desktop Speed Duplex Installing the Switch in an Equipment RackMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Monitoring the Initialization Processes Switch Initialization MessagesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Appendix a Technical SpecificationsEnvironmental Specifications Physical SpecificationsPower Specifications Pin Signal Connectors and Port PinoutsPin Pair Signal Appendix a Technical Specifications