Allied Telesis AT-X210-24GT, AT-X210-9GT, AT-X210-16GT manual Selecting a Site for the Switch

Page 34

Chapter 2: Installation

Selecting a Site for the Switch

Observe the following requirements when choosing a site for your switch:

„If you plan to install the switch in an equipment rack, verify that the rack is safely secured and will not tip over. Devices in a rack should be installed starting at the bottom, with the heavier devices near the bottom of the rack.

„If you are installing the switch on a table, verify that the table is level and secure.

„The power outlet for the switch should be located near the unit and should be easily accessible.

„The site should provide for easy access to the ports on the front of the switch. This will make it easier for you to connect and disconnect cables, as well as view the switch’s LEDs.

„Air flow around the unit and through its vents on the side and rear should not be restricted so that the switch can maintain adequate cooling.

„

„

„

„

Do not place objects on top of the switch.

Do not expose the switch to moisture or water. Ensure that the site is a dust-free environment.

You should use dedicated power circuits or power conditioners to supply reliable electrical power to the network devices.

24

Image 34
Contents Installation Guide Copyright 2013 Allied Telesis, Inc Electrical Safety and Emissions Standards Translated Safety Statements Contents Contents Figures List of Figures Tables List of Tables Viii Preface Symbol Conventions Contacting Allied Telesis Page Overview ChapterFeatures SFP SlotsPage Package Contents Front and Back Panels AT-x210-9GTAT-x210-9GT Management Software Twisted Pair Ports Power LEDsStandby 10Base-T/ 100Base-TX/1000 Base-T Link Activity LEDs AT-x210-16GT Link/Activity LEDs AT-x210-9GT SFP Speed and Link/Activity LEDs SFP Power Supply Overview Installation Reviewing Safety Precautions Page Selecting a Site for the Switch Cable Specifications Type of CableUnpacking the Switch Installing the Switch on a Table or a Desktop Installing the Switch in an Equipment Rack Speed DuplexMounting an AT-x210-24GT Switch in an Equipment Rack Close up showing a bracket positioned for an AT-x210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack Fitting brackets to the mounting for an AT-x210-9GT Mounting an AT-x210-9GT Switch in an Equipment Rack Securing cables to the cable tray for an AT-x210-9GT Installing Optional SFP Transceivers Inserting the SFP on an AT-x210-16GT SFP Transceiver Handle Installation Cabling the Switch Installation Powering On the Switch Installation Switch Initialization Messages Monitoring the Initialization ProcessesSwitch Initialization Messages Switch Initialization Messages Installation Troubleshooting Troubleshooting Page Troubleshooting Technical Specifications Appendix aPhysical Specifications Environmental SpecificationsPower Specifications Connectors and Port Pinouts Pin SignalPin Pair Signal Appendix a Technical Specifications