Briggs & Stratton 071013 manual Power Wiring Interconnections

Page 7

INSTALLATION

Power Wiring Interconnections

All wiring must be the proper size, properly supported and protected by conduit.All wiring should be done per applicable federal, state and local codes, standards and regulations.

Complete the following connections between the transfer switch, power management system and main breaker panel (Figure 2, on next page).Also see the wiring decal on page 9.

WARNING

Low voltage wire cannot be installed in same conduit as power voltage wiring.

Failure to follow above warning could cause personal injury, damage and/or malfunction of equipment.

CAUTION

Improper installation can cause damage to the circuit boards and shorten their life. Installing circuit boards in live circuits will damage the board and is not a warranty condition.ALWAYS disconnect ALL sources of power prior to servicing.

Remove all power prior to installing this power management system. Failure to do so could cause internal damage to the board when making electrical connections.

Turn generator to OFF position.

Turn off utility power to the home standby generator and transfer switch.

1.Set generator’s main circuit breaker to OFF (open) position.

2.Identify loads and their priorities (using sheet provided) to be transfered to power management system in main breaker panel.

3.In main breaker panel, turn selected load circuit breakers to OFF position.

4.Connect “GND” lug to an approved ground.

NOTE: Assure grounding electrode conductor is connected and bonded per applicable federal, state and local codes, standards and regulations.

5.Using supplied 1/4” double male, single female lugs, connect generator 240VAC from transfer switch to relay board in power management system.

6.Unplug current transformers from controle module in transfer switch.

7.Cut two pin connector ends off of current transformer leads and discard. Strip wires and place in supplied wire connectors.

8.Using installer supplied 300VAC or greater wire, run wires from wire connectors to controle module terminal block labeled “CT1A” through “CT2B” in power management system.

9.Using installer supplied 300VAC or greater wire, connect controle module terminals “B-B” in transfer switch to controle module terminal block labeled “TXSF” and “TXFG” in power management system.

10.Wire the air conditioner thermostat control wiring to the controle module labeled “AC1A-AC2B” in power management system.

NOTE: AC1A and AC1B is for the priority 1 air conditioner. AC2A and AC2B is for the priority 2 air conditioner.

11.For 120VAC selected loads, remove wire from selected load circuit breaker.

12.Using installer supplied 300VAC or greater wire, connect selected load circuit breaker to terminal block at power management system labeled “CB/B1” for priority 1 load.

13.Using installer supplied 300VAC or greater wire and a wire nut, connect the selected load wire to terminal block in power management system labeled “RLY/B1” for priority 1 load.

14.Repeat steps 11 through 13 for all other 120VAC priorities using terminals “CB/C1” through “RLY/D2”.

15.For 240VAC selected loads, remove both wires from selected load circuit breaker and place in load side of installer supplied contactor.

16.Using installer supplied 300VAC or greater wire, connect circuit breaker to line side of contactor.

17.Using installer supplied 300VAC or greater wire, connect one pole of the circuit breaker to terminal block in power management system labeled “CB/B1” for a priority 1 load.

18.Using installer supplied 300VAC or greater wire, connect Neutral in main breaker panel to contactor coil.

19.Using installer supplied 300VAC or greater wire, connect contactor coil to terminal block in power management system labeled “RLY/B1” for a priority 1 load.

20.Repeat steps 15 through 19 for all other 240VAC priorities using terminals “CB/C1” through “RLY/D2”.

21.Tighten all wire connections/fasteners to proper torque. See inside power management system enclosure for proper torque values.

7

Image 7
Contents Installation Operator’s Manual Table of Contents Use power management system only for intended uses Important Safety InstructionsIntroduction For the Installing Dealer/ContractorFor the Home Owner Owner Orientation Installer ResponsibilitiesEquipment Description Unpacking InstallationMounting Guidelines Power Wiring Interconnections Typical Installation Diagram for Power Management System System SetupWiring Decal System Operation SpecificationsTesting the Power Management System When Calling the FactoryProblem Cause Correction TroubleshootingElectrical Load Worksheet MANUAL, Load Control Center Exploded View & Parts ListWASHER, Shakeproof, Ext M6 1/4 DECAL,WarningPage Warranty Period Mise À Lessai DU Système DE Gestion DE Lalimentation Table DES MatièresAvertissement Directives DE Sécurité ImportantesIntroduction Au Détaillant ou à lEntrepreneur Procédant à lInstallationAu Propriétaire Résidentiel Vérifiez tous les codes fédéraux, provinciaux et locaux Responsabilités de lInstallateurConseils au Propriétaire Description de lÉquipementDéballage InstallationConsignes dinstallation Dinstallation du système de gestion de l’alimentationLes connecteurs de fils fournis Interconnexions du câblage dalimentationModule de commande Configuration du systèmeDécalcomanie Dinstallation Éléctrique Si vous Devez Communiquer avec lUsine CaractéristiquesFonctionnement Mise À Lessai DU Système DE Gestion DE LalimentationDu climatiseur est expiré DépannageDes terminaux De verrouillage est expiréFiche Technique DE Charge Électrique Période DE Garantie Tabla DE Contenido Advertencia Instrucciones Importantes DE SeguridadPrecaución Para el Propietario Doméstico IntroducciónLea y cumpla las instrucciones incluidas en el manual Orientación para el PropietarioResponsabilidades del Instalador Descripción del EquipoDesempaque InstalaciónPautas de Montaje Conecte el terminal GND a una toma de tierra aprobada Interconexiones de Cableado de EnergíaPosiciones Configuración del SistemaConmutador Alambrar LA Calcomanía Si Necesita Llamar a Fábrica EspecificacionesSistema Funcionamiento Prueba DEL Sistema DE Gestión DE Energía EléctricaReparacion DE Averias Hoja DE Trabajo DE Cargas Eléctricas Notas Período DE Garantía