Management
Table of Contents sections 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
Next, configure the PDU’s power outlets according to the physical connection to the server or other equipment by clicking on
the tab.
Drag the target name from the right side’s current targets list to the left side’s corresponding power outlet.
when you’re done. Your PDU has been configured and the power option () becomes available from the “Access” tab.
Figure 47 Performing power commands
The following commands can be performed from the HQ interface.
Figure 46 Adding new PDUs – Outlets tab
Figure 48 Power commands
To cancel, click.
OmniView IP 5000 HQ | 34 |