Marathon Computer V-4224 Diagram Bale TIE OFF/BALE Eject, Front View of Baler, Side View

Page 10

1 OPERATION

DIAGRAM - BALE TIE OFF/BALE EJECT

FRONT VIEW OF BALER

 

FEED GATE OPENS

SIDE VIEW

 

WHEN BALE DOOR

 

IS OPENED

 

PLATEN

 

BALE TIE SLOTS

 

BALE TIES ENTER

BALE TIES

THROUGH PLATEN

FOLLOW

LOOPED END FIRST

WIRE

 

 

GUIDES

BALE TIE SLOTS

BALE TIES EXIT

 

BALE CHAMBER

THROUGH FLOOR

 

DOOR OPENED

 

BALE DURING

BALE TIE - TIGHTENED

HAND TIGHT

EJECTION

 

EJECTED

 

BALE

 

PALLET OR BALE CART

SIDE VIEW

RECOMMENDED FOR

- BALE

SUPPORTING BALE

 

1-8

Image 10
Contents Play IT Safe VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PAContents Operation EC Declaration of Conformity Stand Clear While Baler is in Operation PRE-OPERATING InstructionsControls ON-OFF Keyed Selector Switch Control DescriptionOperating Instructions Making a Bale To Make a BaleOperating Instructions Bale TIE OFF/BALE Eject For Bale TIE OFF & Bale EjectSide View Diagram Bale TIE OFF/BALE EjectFront View of Baler BaleTIE Slot Cleaning Slot Cleaning Tool Front ViewDecals Decal Placement 460400 Supporting of Platen Monthly Periodic MaintenanceAnnual Filter Maintenance Three MonthsPressure Setting Hydraulic System Pressure SettingPressure Setting and Interlock Testing Magnetic Interlock TestingCylinder Removal Cylinder Removal and RebuildingCylinder Rebuilding Feed Gate Latch Adjustment Operating Characteristics Principles of OperationCharts Electrical Requirements VoltagePanel BOX Power Unit Electrical Schematic Hydraulic Schematic 0489Parts List Recommended OilsInstallation General InstallationAnchoring to Concrete PAD Electrical Installation Grounding InstructionsMotor Rotation Applies to Three Phase Units only START-UP Instructions