Marathon Computer V-4224 installation manual Operation

Page 3

1 OPERATION

INTRODUCTION

THANK YOU FOR PURCHASING A MARATHON VERTICAL BALER.

This product is designed to give you reliable service and superior performance for years to come. To guarantee top performance and the safest operation of the baler, each person involved in the operation, maintenance and installation of the baler should read and thoroughly understand the instructions in this manual and follow all warnings.

The employer(s) involved in the operation, maintenance and installation of the baler should read and understand the most current version of the following applicable standards:

ANSI Standard No. Z245.5, “Safety Requirements For Baling Equipment” A copy of this standard may be obtained from:

Environmental Industries Association

4301 Connecticut Avenue, N.W.

Suite 300

Washington, D.C. 20008

Telephone: 1-202-244-4700

OSHA 29 CFR, Part 1910.147, “The control of hazardous energy (lockout/tagout)”

ALL SERVICE OR REPAIR PROCEDURES DESCRIBED IN THIS MANUAL SHOULD BE PERFORMED BY AUTHORIZED, FULLY TRAINED PERSONNEL.

Any service or repairs that go beyond the scope of this manual should be performed by factory authorized personnel only.

IF YOU SHOULD NEED FURTHER ASSISTANCE, PLEASE CONTACT YOUR DISTRIBUTOR. YOU WILL NEED TO PROVIDE THE BALER SERIAL NUMBER, INSTALLATION DATE, AND ELECTRICAL SCHEMATIC NUMBER TO YOUR DISTRIBUTOR.

IF YOU HAVE ANY SAFETY CONCERNS WITH THE EQUIPMENT, OR

NEED FURTHER INFORMATION, PLEASE CONTACT US AT:

Marathon Equipment Company

P.O. Box 1798

Vernon, Al 35592-1798

Attn: Field Service Department

1-800-633-8974

1-1

Image 3
Contents VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PA Play IT SafeContents Operation EC Declaration of Conformity PRE-OPERATING Instructions Stand Clear While Baler is in OperationControls Control Description ON-OFF Keyed Selector SwitchTo Make a Bale Operating Instructions Making a BaleFor Bale TIE OFF & Bale Eject Operating Instructions Bale TIE OFF/BALE EjectBale Diagram Bale TIE OFF/BALE EjectFront View of Baler Side ViewSlot Cleaning Tool Front View TIE Slot CleaningDecals Decal Placement 460400 Supporting of Platen Three Months Periodic MaintenanceAnnual Filter Maintenance MonthlyHydraulic System Pressure Setting Pressure SettingMagnetic Interlock Testing Pressure Setting and Interlock TestingCylinder Removal and Rebuilding Cylinder RemovalCylinder Rebuilding Feed Gate Latch Adjustment Principles of Operation Operating CharacteristicsVoltage Charts Electrical RequirementsPanel BOX Power Unit Electrical Schematic 0489 Hydraulic SchematicRecommended Oils Parts ListGeneral Installation InstallationAnchoring to Concrete PAD Grounding Instructions Electrical InstallationSTART-UP Instructions Motor Rotation Applies to Three Phase Units only