Marathon Computer V-4224 installation manual Cylinder Removal and Rebuilding, Cylinder Rebuilding

Page 19

2 MAINTENANCE

CYLINDER REMOVAL AND REBUILDING

DANGER: DO NOT CLIMB ON SIDES OF BALER. USE A LADDER OR WORK PLATFORM WHEN WORKING ON TOP OF THE BALER OR OTHER AREAS OF THE BALER THAT CAN NOT BE REACHED FROM GROUND LEVEL.

WARNING: FEED GATE WILL EXTEND ABOVE THE TOP OF THE BALER WHEN THE FEED GATE IS RAISED.

CYLINDER REMOVAL

1.Close the feed gate.

2.Turn on power and lower the platen using the MANUAL DOWN button. Turn off power.

3.Disconnect and Lock-out and Tag-out power per instructions on page 2-1.

4.Open the bale door. When the bale door is opened, the feed gate will raise.

5.Support platen with fork lift to take pressure off of the cylinder pins and to prevent the platen from falling when pins are removed.

6.Remove bolts and cotter pins from the cylinder pins.

7.Remove platen from front of baler.

8.Turn on power and retract cylinder rods.

9.Disconnect and Lock-out and Tag-out power per instructions on page 2-1.

10.Relieve hydraulic pressure by manually depressing solenoid valve (both sides).

11.Relieve pressure on the counter balance valve. Loosen the locknut on the counterbalance valve and adjust the valve clockwise all the way in to relieve the pressure.

12.Disconnect one hydraulic hose at a time. Plug the hose port before disconnecting another hose. NOTE: Remove hose fittings slowly.

WARNING: BE SURE HYDRAULIC CYLINDERS ARE SECURELY SUPPORTED BEFORE PROCEEDING.

13.With the hydraulic cylinders supported, remove the cylinder pins.

14.Remove cylinders.

15.Before reinstalling cylinders, check cylinder pins, bolts, and cylinder rods for signs of fatigue. Do not reuse parts if wear or cracks are present.

16.To reinstall the cylinders, reverse the above steps.

NOTE:Use new bolts, nuts, and cotter pins when re-installing the cylinder pins.

17.After reinstallation of cylinder(s), readjust pressure on the counter balance valve. See Page 2-4 for proper procedures.

CYLINDER REBUILDING

1.Remove hydraulic cylinder from baler.

2.Remove retainer nut from gland.

3.Remove internal retaining ring.

4.Remove rod from cylinder barrel.

5.Remove piston locknut and piston from cylinder rod.

6.Replace all seals. Discard old seals and old piston locknut.

7.Replace gland on rod.

8.Install piston on cylinder rod using new locknut (included in seal kit). NOTE: Do not reuse old locknut. Torque new locknut to 275 - 330 ft-lbs.

9.Install piston and rod assembly in cylinder barrel. Be careful not to damage seals.

10.Install gland in barrel. Install internal retaining ring.

11.Install retainer nut to gland. Reinstall cylinder in baler.

2-6

Image 19
Contents VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PA Play IT SafeContents Operation EC Declaration of Conformity PRE-OPERATING Instructions Stand Clear While Baler is in OperationControls Control Description ON-OFF Keyed Selector SwitchTo Make a Bale Operating Instructions Making a BaleFor Bale TIE OFF & Bale Eject Operating Instructions Bale TIE OFF/BALE EjectBale Diagram Bale TIE OFF/BALE EjectFront View of Baler Side ViewSlot Cleaning Tool Front View TIE Slot CleaningDecals Decal Placement 460400 Supporting of Platen Three Months Periodic MaintenanceAnnual Filter Maintenance MonthlyHydraulic System Pressure Setting Pressure SettingMagnetic Interlock Testing Pressure Setting and Interlock TestingCylinder Removal Cylinder Removal and RebuildingCylinder Rebuilding Feed Gate Latch Adjustment Principles of Operation Operating CharacteristicsVoltage Charts Electrical RequirementsPanel BOX Power Unit Electrical Schematic 0489 Hydraulic SchematicRecommended Oils Parts ListGeneral Installation InstallationAnchoring to Concrete PAD Grounding Instructions Electrical InstallationSTART-UP Instructions Motor Rotation Applies to Three Phase Units only