Marathon Computer V-4224 installation manual Power Unit

Page 24

2 MAINTENANCE

POWER UNIT

 

 

 

 

 

 

 

DIRECTIONAL CONTROL

 

COUNTERBALANCE VALVE

 

 

 

VALVE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RELIEF VALVE (RV1)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PUMP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBPLATE

 

 

 

 

 

 

 

PUMP/MOTOR

 

 

 

 

 

ADAPTER

 

 

CLEAN OUT COVER

 

 

 

 

 

 

 

 

 

 

 

 

 

HUB COUPLING

BREATHER CAP

MOTOR

SUCTION FILTER (LOCATED IN RESERVOIR)

SIGHT GAUGE

NOTE: See RECOMMENDED OIL on page 2-14.

2-11

Image 24
Contents Play IT Safe VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PAContents Operation EC Declaration of Conformity Stand Clear While Baler is in Operation PRE-OPERATING InstructionsControls ON-OFF Keyed Selector Switch Control DescriptionOperating Instructions Making a Bale To Make a BaleOperating Instructions Bale TIE OFF/BALE Eject For Bale TIE OFF & Bale EjectDiagram Bale TIE OFF/BALE Eject Front View of BalerSide View BaleTIE Slot Cleaning Slot Cleaning Tool Front ViewDecals Decal Placement 460400 Supporting of Platen Periodic Maintenance Annual Filter MaintenanceMonthly Three MonthsPressure Setting Hydraulic System Pressure SettingPressure Setting and Interlock Testing Magnetic Interlock TestingCylinder Removal and Rebuilding Cylinder RemovalCylinder Rebuilding Feed Gate Latch Adjustment Operating Characteristics Principles of OperationCharts Electrical Requirements VoltagePanel BOX Power Unit Electrical Schematic Hydraulic Schematic 0489Parts List Recommended OilsInstallation General InstallationAnchoring to Concrete PAD Electrical Installation Grounding InstructionsMotor Rotation Applies to Three Phase Units only START-UP Instructions