Marathon Computer V-4224 installation manual Charts Electrical Requirements, Voltage

Page 22

2 MAINTENANCE

CHARTS

ELECTRICAL REQUIREMENTS

 

 

 

 

5 HP 400V 3 PHASE 50HZ

VOLTAGE

 

208 VAC

 

 

230 VAC

 

400 VAC/50 HZ

FULL LOAD

16.7

 

 

15.2

 

8.5

 

AMPERAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISCONNECT

 

30 AMP

 

 

30 AMP

 

30 AMP

SIZE (MAX)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TIME DELAY

 

30 AMP

 

 

25 AMP

 

15 AMP

FUSE (MAX)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INVERSE TIME

 

40 AMP

 

 

40 AMP

 

20 AMP

CIRCUIT BREAKER (MAX)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WIRE SIZE (75 C)

 

 

 

 

 

 

 

 

 

 

20 m

 

12

 

 

 

12

 

 

12 AWG/ 4mm2

 

 

 

 

 

 

 

 

 

 

 

 

30 m

10

 

 

10

 

 

12 AWG/ 4mm2

60 m

6

 

 

8

 

 

12AWG/ 4mm2

90 m

4

 

 

6

 

 

10AWG/ 6mm2

2-9

Image 22
Contents Play IT Safe VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PAContents Operation EC Declaration of Conformity Stand Clear While Baler is in Operation PRE-OPERATING InstructionsControls ON-OFF Keyed Selector Switch Control DescriptionOperating Instructions Making a Bale To Make a BaleOperating Instructions Bale TIE OFF/BALE Eject For Bale TIE OFF & Bale EjectSide View Diagram Bale TIE OFF/BALE EjectFront View of Baler BaleTIE Slot Cleaning Slot Cleaning Tool Front ViewDecals Decal Placement 460400 Supporting of Platen Monthly Periodic MaintenanceAnnual Filter Maintenance Three MonthsPressure Setting Hydraulic System Pressure SettingPressure Setting and Interlock Testing Magnetic Interlock TestingCylinder Removal Cylinder Removal and RebuildingCylinder Rebuilding Feed Gate Latch Adjustment Operating Characteristics Principles of OperationCharts Electrical Requirements VoltagePanel BOX Power Unit Electrical Schematic Hydraulic Schematic 0489Parts List Recommended OilsInstallation General InstallationAnchoring to Concrete PAD Electrical Installation Grounding InstructionsMotor Rotation Applies to Three Phase Units only START-UP Instructions