Marathon Computer V-4224 installation manual Panel BOX

Page 23

2 MAINTENANCE

PANEL BOX

 

GROUND

 

TIMER

TERMINAL

 

 

BLOCK

 

 

OVERLOAD

 

 

ADJUSTMENT

 

 

 

MOTOR

 

 

STARTER

 

 

W/OVERLOADS

 

 

GROUND

RELAYS AND BASES

 

TERMINAL STRIP

2 AMP

 

 

 

 

FUSE

 

2-10

 

Image 23
Contents VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PA Play IT SafeContents Operation EC Declaration of Conformity PRE-OPERATING Instructions Stand Clear While Baler is in OperationControls Control Description ON-OFF Keyed Selector SwitchTo Make a Bale Operating Instructions Making a BaleFor Bale TIE OFF & Bale Eject Operating Instructions Bale TIE OFF/BALE EjectBale Diagram Bale TIE OFF/BALE EjectFront View of Baler Side ViewSlot Cleaning Tool Front View TIE Slot CleaningDecals Decal Placement 460400 Supporting of Platen Three Months Periodic MaintenanceAnnual Filter Maintenance MonthlyHydraulic System Pressure Setting Pressure SettingMagnetic Interlock Testing Pressure Setting and Interlock TestingCylinder Rebuilding Cylinder Removal and RebuildingCylinder Removal Feed Gate Latch Adjustment Principles of Operation Operating CharacteristicsVoltage Charts Electrical RequirementsPanel BOX Power Unit Electrical Schematic 0489 Hydraulic SchematicRecommended Oils Parts ListGeneral Installation InstallationAnchoring to Concrete PAD Grounding Instructions Electrical InstallationSTART-UP Instructions Motor Rotation Applies to Three Phase Units only