Marathon Computer V-4224 installation manual Operating Instructions Making a Bale, To Make a Bale

Page 8

1 OPERATION

OPERATING INSTRUCTIONS - MAKING A BALE

WARNING: DO NOT OPERATE BALER UNTIL OPERATING INSTRUCTIONS ARE UNDERSTOOD. See page 1-4 for control panel layout.

IN CASE OF EMERGENCY:

Push the large red button to

STOP

WARNING: Interlocks and safety devices were installed on this unit for your protection. Never disable or bypass any interlock or safety device. Failure to comply with this warning could result in serious injury or death.

TO MAKE A BALE :

1.Feed material into baler. If starting a new bale, place a large flat piece of material flat on the baler floor. NOTE: Do not attempt to overfill the feed chamber by forcing material into the chamber with the feed gate. This can cause gate release malfunction and may damage baler.

2.Pull gate handle down to close feed gate. NOTE: Check red warning light before closing feed gate. If gate is open and light is on, discontinue use of the baler and call for service.

3.To start the baler, insert the key into the keyswitch and turn to the ON position.

4.Press the AUTOCYCLE button. The platen will make a complete cycle down and back up. When the platen is in the full up position, the feed gate will automatically open and the motor will automatically shutdown.

5.Repeat steps 1 through 4 until the platen stops in the down position, and the “BALE MADE” light comes on.

NOTE: In normal operation, the feed gate will be open when you walk up to place material into the baler. For added security, the feed gate can be manually closed after the AUTOCYCLE(S). To open the gate, you will have to insert the key into the keyswitch and run the baler through a complete AUTOCYCLE.

1-6

Image 8
Contents Play IT Safe VERNON, AL FAYETTE, AL YERINGTON, NV CLEARFIELD, PAContents Operation EC Declaration of Conformity Stand Clear While Baler is in Operation PRE-OPERATING InstructionsControls ON-OFF Keyed Selector Switch Control DescriptionOperating Instructions Making a Bale To Make a BaleOperating Instructions Bale TIE OFF/BALE Eject For Bale TIE OFF & Bale EjectDiagram Bale TIE OFF/BALE Eject Front View of BalerSide View BaleTIE Slot Cleaning Slot Cleaning Tool Front ViewDecals Decal Placement 460400 Supporting of Platen Periodic Maintenance Annual Filter MaintenanceMonthly Three MonthsPressure Setting Hydraulic System Pressure SettingPressure Setting and Interlock Testing Magnetic Interlock TestingCylinder Rebuilding Cylinder Removal and RebuildingCylinder Removal Feed Gate Latch Adjustment Operating Characteristics Principles of OperationCharts Electrical Requirements VoltagePanel BOX Power Unit Electrical Schematic Hydraulic Schematic 0489Parts List Recommended OilsInstallation General InstallationAnchoring to Concrete PAD Electrical Installation Grounding InstructionsMotor Rotation Applies to Three Phase Units only START-UP Instructions